My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1985
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAFAYETTE
>
0
>
2300 - Underground Storage Tank Program
>
PR0541126
>
REMOVAL_1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:47:06 PM
Creation date
11/5/2018 4:22:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1985
RECORD_ID
PR0541126
PE
2361
FACILITY_ID
FA0023550
FACILITY_NAME
CAL TRANS (SPRR PROJECT)
STREET_NUMBER
0
STREET_NAME
LAFAYETTE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
LAFAYETTE ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LAFAYETTE\0\PR0541126\REMOVAL 1985.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DF.PAATMENr OF 7RAN51'(1iil'A7'If)N CONTRACT N). sHE�I <br /> RIGHT Of WAY CLEARANCE WITHOUT PLANS Bid No. 86-1 10 A 514 3 or-. 4 8' <br /> SPECIAL PROVISIONS: SPECIFICATIONS- <br /> The work embraced herein constitutes a "R/W Clearance Contract". It shall be done in accordance with the "General Specifications for <br /> Service Contracts" of the Department of Transportation, dated.1981, hereinafter referred to as "General Specifications;' andin accordance <br /> with the following special provisions.and proposal, and the proposed"Form of Contract' (Form ) <br /> PROPOSAL REQUIREMENTS AND CONDITIONS <br /> If bond security accompanies the bid, it shall be inserted with the bid under seal.. <br /> Bids: in excess of $25 , 000 ,.. performance and payment bonds will be <br /> required, each. equal to one-half of the contract amount.. <br /> A' bidders bond will be. required of any- proposal submitted.. <br /> he General <br /> Sections 1 through 10 of t Specifications and the Demolition <br /> and, .Removal Details. in these Special Provisions shall apply. The <br /> Standard Specifications , dated July, 1984 , shall apply where mentioned. <br /> The bid of any contractor who is currently in default with Caltrans on a-contract already awarded may be regarded as:nonresponsive <br /> and may be rejected. Default is defined as being within.a period-of liquidated damages on uncompleted work or under notice to begin <br /> or complete a contract where work has not commenced or was suspended-without cause. <br /> AWARD;OF CONTRACT <br /> The contact will be awarded to the responsible bidder who submits <br /> the lowest bid. However, any bid not deemed in the State ' s best <br /> interest may be rejected. <br /> TIME FOR COMPLETION AND LIQUIDATED DAMAGES <br /> The Contractor shall begin work by the date specified in the Contract-Administrators letter informing him that the contract has been approved, <br /> and shall diligently prosecute the work so that. all the work shall be completed before the expiration of consecutive <br /> working days including the specified starting date. <br /> The Contractor shall.notify the Const uction Office 1976 E. Charter Way, Stockton, CA <br /> (Contract Administrator) <br /> 95205 , (209) 948-7849 <br /> (Addrea and telephone number) <br /> at least 24 hours in advance of starting work. <br /> In addition to any penalties prescribed herein, should the Contractor fail to commence work within five (5) working days after notification <br /> of the starting date, or suspend work for a period of five (5) continuous working days after work has begun, the State may provide five (5) <br /> days written notice, posted at the job site or mailed to the Contractor, to timely prosecutc and complete the work or the contract may be <br /> terminated and penalties of$ 5()Cl assessed for administrative costs for rebidding the work. <br /> In addition, the Contractor shall be liable to the State for the difference between the Contractors bid price and the actual cost of performing <br /> the work by the second low bidder or by another contractor. <br /> The Contractor shall pay to the State of California $ 100 for each and every calendar day's delay in finishing the work in excess <br /> of the number of working days prescribed above. <br /> DASQBM-1501(REV.9182) <br />
The URL can be used to link to this page
Your browser does not support the video tag.