My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
COMPLIANCE INFO 1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:59 PM
Creation date
11/5/2018 4:32:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\COMPLIANCE INFO 1996 - 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name = - <br /> Facility Address j `- l: <br /> . c-sz <br /> A, Describe the frequency of performing the monitoring: �� c <br /> Tank er - c- <br /> Piping �- <br /> B, What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank G <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot pian <br /> should be attached): � ,�� <br /> land: � if1L SCG Li]� cs.:,Sl� - <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> c�: 5c <br /> E. Reporting format for monitoring: \ � <br /> Tank '�"� '�` <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring <br /> oni maintenancelt.Note: <br /> Maintenance must be in accordance with the manufacturers' <br /> ie <br /> but not less than every L months: <br /> c L 1 <br /> (�. Describe the training necessary for the operation of UST system, including piping, <br /> .<.._. ` "\( <br /> 1 GS <br /> and the monitoring equipment:`` <br />
The URL can be used to link to this page
Your browser does not support the video tag.