Laserfiche WebLink
Page 3 of 9 <br /> • SWROB January 20G2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: L Piping Manufacturer W industry Standard Professional Engineer <br /> 1_1 Other(MaLfyl <br /> _ <br /> Test Method Used: � Pressure '. Vacuum lHydrostatic <br /> D Other(SpeiW <br /> Test Equipment Used: Pressure Gauge Equipanent Resolution: 1 PSI <br /> Piping .Run 91 Pi inRun 89 Piping Run 87 Pi in Run <br /> Piping Material: FG FG FG <br /> Piping ManutactureT: Ameron Ameron Ameron <br /> Piping Diameter: 2" 2" 2 <br /> Length of Piping Run: 1w 130' 130' <br /> Product Stored: 91 UNLD 69 UNLD 87 UNLD <br /> Method and location of piping-run <br /> isolation Booted at STP and UDC Booted at STP and UDC Booted at STP and UDC <br /> Wait time between applying <br /> pressurelvacumelwater and <br /> starting test: 15 min 15 nein 15 min <br /> Test Start Time: 14:15 14:45 15:15 <br /> Initial Reading: 0 0 0 <br /> Test End Time: 14:15 14.45 15:15 <br /> Final Reading: 0 0 0 <br /> Test Duration: 15 min 15 min i 5 min <br /> Change in Reading: 0 0 0 <br /> Pass/Fait ail Threshold or Criteria: No Deco No Deco No D <br /> Fail Pass Fail Pass Fail 0 Pass r_ Fall <br /> Test Result: Pass <br /> Comments— include w ormatron on repairs made prTor to testi rig.and recr?mnzended ollo-iv-at or atled tests <br /> 91 line did not hold pressure <br /> 89 line did not hold pressure <br /> 67 line did not hold pressure <br />