Laserfiche WebLink
1 <br /> l - <br /> .___----- . �e_-_........_.. ._...__.._.W_....- ..�......1 <br /> aPW 5 3 V B L FL01� T VENTI-A—LVES <br /> Federal EPA technical standards for overfill prevention of petr-oleunr UST's allow <br /> the use ol`ball float vent valves that restrict the delivery flow when the UST is over- <br /> filled.The EPA requirements state that this flow restriction must occur when the <br /> tank is no more than 90% 1`ull.The OPW 53VML series is designed to wn.,isteritly <br /> and dramatically reduce delivery flow rate. (Sec OPW 30MV w comply with 1 I'r1 <br /> standards for a 30 minute;warning.) <br /> Alrel,vr't:ar�l <br /> Installing the incorrect length OPW 53VML for your specific UST application <br /> may result in delivery flow restriction at liquid levels exceeding the W/o maxulwin <br /> established by EPA.Always consult the appropriate tank charts and determine the <br /> specifics of your UST installation to determine the appropriate length OPW <br /> 53VML.The illustration and instructions below are intended to scar ve as a guide in <br /> this determination. <br /> Grade Level <br /> il:,jil., I•,rri.•,I ear 1,... ,., I ., � j� �- , <br /> .. Measure distance"I" from a <br /> referencenealr oint rade level to <br /> P g (� I„ <br /> the top of the extractor Cage bar. OPW 104A s <br /> Manhole or t, Reference <br /> �._.` <br /> ,. Using the appropriate wrench, OPW 1 spill Point` r � e N r' }.. " <br /> ° , . y., <br /> remove the extractor cage and Container ' <br /> existing float vent valve. <br /> v <br /> Measure distance"II"from the s u <br /> cane OPW]111T Cap ", �—, '• <br /> reference point near grade level to <br /> the inside diameter of the UST. Or, OPW 1611AV vapors <br /> using a dipstick,determine the return titling <br /> distance from the reference point to <br /> '"•r \t �4 is t: �" <br /> the bottom of the UST,and subtract OPW 233V or 233V61 Vapor <br /> the tank inside diameter. recovery/exlraclor fitting <br /> ,•: 9i• 5l� f <br /> From the correct tank char,determine <br /> the distance"IV"that corresponds to <br /> 4"Tank <br /> "Bung" <br /> l0% ofthe total USTcapaeitY Fitting <br /> W OPW 53VML length(VI)=11+IV- <br /> law c'ti, ... .._.r�:... UST ;�~ : 10%of total <br /> vapor VI Baa asdeterminedle <br /> orifice IV from appro- <br /> Follow the same procedure above or priale tank <br /> measure and calculate dimension chart <br /> "V"from the inside diameter ol'thc .� <br /> UST to the end of a 2" opt. pips - -' <br /> threaded into the extractor cage.The <br /> nominal tight engagement of 2" pipe <br /> threads is '," <br /> Y <br /> OPW 53VML length(VI)=1V+V <br /> . For extended manway applications, <br /> the total length of'coupling and pipe lam, <br /> extension for the DPW 53VML <br /> should match the length of the; <br /> matnway extender. <br />