Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mal <br /> PLAN TYPE t9 MONITORING IS IDENTICAL FdR ALL USTs AT THIS FACILITY. <br /> (Check one item only) [ITHIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Moz <br /> FACILITY IDH(Agency Use Only) I. FACILITY INFORMATION <br /> FACILITY NAMEy_ � Mo3. <br /> � YLsv.7 <br /> FACILITY SITE ADDRESS l tr(0 La�rc,2 <br /> 4 M04, CITYRA EP e- <br /> Mos <br /> II. EQUIPMENT TESTING ANIS PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Moo <br /> accordance with the equipment manufacturers instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED X ].ANNUALLY ❑ 99.OTHER(Specify): Mol <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> .g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e <br /> form Hazardous Materials Business Plan map,etc. which shows all required in g., <br /> include it with this plan. <br /> IV, TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) I- " <br /> OK 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAU <br /> SECONDARY CONTAINMENT IS: �J a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE <br /> I ❑ d.LENDER VAC <br /> PANEL MANUFACTURER: G1IbP{cc bwC' M12. MODEL#: 26-(zzoliOoope <br /> LEAK SENSOR MANUFACTURER: _ ©o} M14. MODEL#(S). 2t] <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> IN-TANK PROSE MANUFACTURER: MIS. MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ c.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify);SP eci M22. M23 <br /> 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS <br /> ❑ b.60 HOURS M25 <br /> 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: Ka.ANNUALLY ❑ c.OTHER(Specify): M26 M27, <br /> 6.VISUAL MONITORING DONE: % a.DAILY 0 b`BIENNIALLY <br /> [Requires agency approval) <br /> ❑ 99.OTHER(Specify): <br /> M29, <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) M30. <br /> (A 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 19 a,DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31 <br /> PANEL MANUFACTURER: ' M32. MODEL#: M33. <br /> LEAK SENSOR MANUFACTURER: V M34. MODEL#(S): Mas <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? X a.YES ❑ b.NO M37 <br /> tq 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): M" Mae. MODEL#(S): M39. <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moo MODEL#: M41 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1gP NO h. Mae <br /> ❑ a <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ bM43. <br /> WILL ELLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? .YES . M44 <br /> 4.INTEGRITY TESTING © a.YES C1 b.NO <br /> TEST FREQUENCY: pL a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46 <br /> ❑ S.VISUAL MONITORING DONE: ❑ a.DAILY Q b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> .Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC§252111.*)(3) <br /> 0 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) <br /> NI-13 <br /> SJCEHD-d(07103)-114 <br /> 07/23/03 <br />