Laserfiche WebLink
SWRCB,January 2002 Page_ of <br /> 10. SPILL/O'VERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By; Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> Other(Sped) <br /> Test Method Used: ❑Pressure I Vacuum I Hydrostatic <br /> ❑Other(Sped) <br /> 'fest Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box # 7Spill Box# <br /> Bucket Diameter; <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R�): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments—(include in ormation on repairs made prior to testing, and recommended follow-u for failed tests) <br />