Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> Fosch <br /> TED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2) <br /> MONO <br /> VII . INSPECTION HiSTORY Y N <br /> up action of section IiI from the previous inspection been completed appropriately? ❑ <br /> ntation verifying appropriate service to this report) 19 <br /> VIII . ALARM HISTORY <br /> Attach a copy of the alarm history reporVlog to this report. Y N INAl <br /> Is the monitoring system powered on and In proper operating mode? ® ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ® ❑ <br /> (Attach documentation verifying appropriate service to this report) <br /> Have all containment sumps, that have had a leak detection alarm since the previous inspection , been responded to by a qualified UST ® ❑ ❑ <br /> service technician? <br /> List below in section 1X, all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualifled UST service technician. Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance and EMeer sensor location. The results of the visual ins action must be recorded in section !X. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage, water, debris, and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> T1 : Regular- STP ❑ ❑ ❑ ❑ <br /> T2 : Premium- STP ❑ ❑ ❑ ❑ <br /> T3 : Diesel- STP ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage, water, debris, and hazardous substance? <br /> TANK !D T1 : Regular ® ❑ T3: Diesel ® , ❑� <br /> T2 : Premium ® ❑ ❑ <br /> Is the fill pipe free of obstructions? <br /> TANK ID T1 : Regular IgTO T3 : Diesel 101 ❑ <br /> T2 : Premium 101111 1010 <br /> Is the fill cap securely on the fill pipe? <br /> TANK ID T1 : Regular r1@1 <br /> ❑ T3 : Diesel ® ❑ <br /> T2: Premium ❑ L , —_ _� 101 ❑ <br /> Is the under-dispenser containment free of damage, water, debris , and hazardous substance? <br /> Under-dispenser Containment ID Y N NAJ Under-dispenser Containment ID Y N NA <br /> 1 /2 ® ❑ 01 O ❑ O <br /> 314 ® ❑ ❑ 11 ❑ ❑ <br /> 516 ® ❑ ❑ ❑ ❑ ❑ <br /> 7/8 ® ❑ ❑ ❑ ❑ ❑ <br /> 9/ 14 ® ❑ ❑ ❑ ❑ ❑ <br /> 11112 ® ❑ ❑ ❑ ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ® ❑ ❑ <br /> X. TESTING AND MAINTENANCE Y N NA DATE LAST <br /> PERFQRMED <br /> Has the monitoring system certification been completed within the past 12 months? ® ❑ 12/11 /18 <br /> Has the spill container testing been completed within the past 12 months? ® ❑ 12/1111 $ <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? ® ❑ ❑ 12/11 /18 <br /> Has the secondary containment testing been completed within the past 36 months? ® ❑ ❑ 1 /24/18 <br /> /1 <br /> Has the tank tightness testing been completed within required timeframes? © ❑ ❑ <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ ❑ <br /> Otherrequired testing / maintenance was completed within required timeframe . List testlmaintenance items below. <br /> Test / Maintenance: Air Quali test ® ❑ 12111 /18 <br /> Test / Maintenance: ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance: ❑ ❑ <br /> Test / Maintenance: ❑ ❑ <br /> Test / Maintenance: El ElXI. FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? ® ❑ <br /> if the facility has more components than this form accommodates, additional copies of this page may be attached <br /> Y = Yes N = No. NA = Not Aodicable. ID = IdeMirMation <br />