Laserfiche WebLink
Monitoring System Certification � 1 <br /> UST Monitoring Site Plan <br /> Site Address: LATHROP GAS 8 FOOD 140 LATHROP ROAD LATHROP CA 95330-9718 ^' <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . �. .0 � . <br /> . . . . . . <br /> DIE ❑ . . . . . . . . . . . . <br /> A O O X <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . 91 . . . . . . . . . . 0. . . . . . . . <br /> T . . . . . . . . . . <br /> OF V O X . . . . . . . . . . . . . . . . . . . . <br /> 87 <br /> . O p V O X . . . . . . . . . �. . . . . . . �. J <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> A=ANNULAR <br /> CAR WASH F=FILLS STORE <br /> T=TURBINE <br /> P=PROBE=VAPOR ' ' <br /> X=SUMP SENSOR <br /> L=PLLD <br /> M=Manway <br /> B=Brine Sensor TLS <br /> I=Smart Sensor <br /> S=STP . . . <br /> C=Floats&Chains . <br /> Date map was drawn: 12r9/2015. <br /> Instructions <br /> if you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if Installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Pa e 4 of 4 2/21/07 <br /> Monitoring System Certification9 <br />