Laserfiche WebLink
=T T S Integrity Tank Testing Systems, Inc. <br /> STANDARD CONTRACT TERMS AND CONDITIONS <br /> 1 . It is expressly recognized and agreed that the sole <br /> responsibility of Contractor is to test , through means of the <br /> HORNER EZY CHEK LEAK DETECTION SYSTEM, for leaks in underground <br /> storage tanks and the piping leading thereto from pumps or a <br /> loading facility in use by Owner-Operator described in paragraph <br /> two (2 ) ; and to deliver to Owner-Operator a written report with <br /> respect to the results of Contractor ' s tests . <br /> 2 . Contractor shall test the tank (s) and associated piping <br /> with the following description (s) : <br /> Tanks located at 14/,4 Tath ro,p Road inch vop CA 9S 330 <br /> Testing to start at _ 8 , 00 A -Mon April 10 1987 <br /> **To be scheduled . <br /> TANK CAPACITY TANK NUMBER PRODUCT CONTAINED <br /> 6 ,000 gallon Motor Oil <br /> * 1, 000 gallon Waste oil <br /> 12 ,000 gallon Diesel Fuel <br /> 12 , 000 gallon Diesel Fuel <br /> **12 ,000 gallon X 3 Manifold System Diesel Fuel <br /> 3 . For the testing of the above-described tanks . Contractor <br /> shall be paid the following fee , per tank , per test : <br /> I <br /> THRFF HITNnRFn TWFNTY-FTVF dollars , ( $325 .00) 9 <br /> * TWO HUNDRED SEVENTY-FIVE ($275 . 00) , and ** SIX HUNDRED ( $600 . 00) . <br />' 4 . All fees will be invoiced by the Contractor upon <br /> completion of the test . All amounts invoiced are due and payable <br /> on a net cash basis . Owner-Operator agrees to pay reasonable <br /> attorneys ' fees as fixed by the court , and interest charges , at <br /> the rate of 1 . 5% per month, in the event legal action is necessary <br /> to collect balances due . <br /> 5 . Contractor shall have no responsibility whatever for the <br /> repair of any leaks which may be detected or in any way in <br /> connection with or with respect to any contaminant or hazardous <br /> waste which may exist before Contractor ' s testing, during <br /> Contractor ' s testing, or at any time after Contractor ' s testing . <br /> The sole responsibility for any reports to governmental agencies <br /> or authorities and for the removal and disposal of any such <br /> contaminant or hazardous wastes , and any corrective or remedial <br /> action in any way in respect thereto , shall be that of the <br /> Owner-Operator, alone . Contractor shall have no responsibility <br /> whatever in any way in connection with any attempted corrective or <br /> remedial action by Owner-Operator or its contractors , <br /> subcontractors , or any other third party . The provisions of this <br /> paragraph shall be included in any contract entered into by <br /> Owner-Operator in connection with the subject matter of this <br /> Agreement . <br /> 800 262 TEST 166 Frank West Circle Stockton, CA 95206 (209) 466-8036 <br />