Laserfiche WebLink
�� �1 <br /> COLONIAL ENERGY <br /> • Obtain and pay for the required CUPA permit. <br /> • Furnish and install Bravo Encore Deflector Plates in all 12 dispensers,2 per dispenser. <br /> • Deflector Plates are epoxy powder-coated,with required"Keep in Place" label. <br /> • Obtain CUPA inspection and sign-off. <br /> UPDATE: This was completed with Betty Ho onsite durine inspection after installation <br /> Violation: Item #315 Water in secondary containment not removed,analyzed,and properly disposed of. <br /> Corrective Action: Liquid was removed and UDC's#5/6 and 417/16 are now free of liquid as of 1-8-18. <br /> Desiz Burn <br /> Compliance Manager <br /> 916-285-7402 X-182(office) <br /> D.Bums@sacstations.com <br /> Sacramento Office 20 Goldenland Court Sacramento,CA,95834 <br />