Laserfiche WebLink
UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />COUNTY 0 <br />z°°'••.,� <br />SAN JOAQUIN <br />r.' <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Facility Address: <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />Service Request #: <br />J q 2 /,4 <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />a• 4 ei. 'T5`�135 <br />. Inspection Date: <br />T We r iota r -f /o <br />C /V <br />/A -/ 7 — 33 <br />Facility Address: <br />M, <br />Service Request #: <br />J q 2 /,4 <br />Leak detector <br />4473&35 <br />Onsite Service Technician's Name: 11 <br />1 ICC Service Technicianllnstaller Exp. Date: <br />3a, <br />Manufacturer Tra'lAP6/ <br />/ <br />I 24) rJ <br />erR <br />a <br />, <br />SERVICE <br />Leak detector <br />EIElmechanical <br />Model: <br />❑ electronic Serial #: <br />M, <br />❑ line test programmed <br />❑ <br />Leak detector <br />El❑ <br />mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />- <br />sensor <br />El❑ <br />positive shutdown Model: <br />❑ fall safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />E]❑ <br />positive shutdown Model: <br />❑ fall safe Serial #: <br />�1 <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fall safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />X This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />M, <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />0 <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />_ psi <br />- <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note. Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />�1 <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />iffy, <br />i <br />// / <br />• <br />r /. 0 / . I i iffir-j <br />M, <br />-� iri ,_�r l: . WMA <br />0 <br />sJ / <br />TO REINSPECTION AT ANY TIME AT EHD'SHOURLY <br />■ - <br />Rec e <br />- <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />