My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 4:34:36 PM
Creation date
11/5/2018 4:47:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\192\PR0505867\BILLING 1995-2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IVFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page I of 2 <br /> TYPE OF ACTION ❑ L NEW PLAN ® 2.CHANGE OF INFORMATION 490.1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> 3. <br /> BUSINESS NAME(Same as Facility Name or DBA) Tower Mart#104 <br /> BUSINESS SITE ADDRESS 103. CITY 104. <br /> 192 Lathrop Rd. Lathrop, CA 95330 <br /> II. EQUIPMENT TESTING AND PREVENTIVE'MAINTENANCE',` <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufactmels'instructions,or annually,whichever is more frequent.Such work must be pafarmed by qw1ified pentormel. 23 CCR§2632,2634,2638.2641] <br /> 490-3. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490ab. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED (23 CCR§2632,26341 <br /> 490-a. <br /> IV. TANK MONITORING IS PERFORMED USING THE;FOLLOWINGMETHOD(S) thataply) <br /> E I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 49-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490." MODEL#: TLS 350 4908 <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL#(S):0794390-420 49010. <br /> __ <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SIN WOLF ALL TANK(S).[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 490-12' MODEL M 490-13. <br /> IN-TANK PROBE MANUFACTURER: 4114. MODEL#(S): 490.15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.02 g.p.h. ❑ c.OTHER(Specify): 490.1918. <br /> _._ _._.. <br /> ago-zo. <br /> ❑ 3 MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 cCR§2646.q -------__ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26°51 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS490-21. <br /> 490-22. <br /> 490.23. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 <br /> a9aza. <br /> _ TEST FREQUENCY: ❑ a.ANNUALLY �_b_BIENNIALLY ❑ c.OTHER(Specify). ___... ......... .............___490-25. <br /> ______ 490.26. <br /> ❑ 99.OTHER(Specify): 490-27. <br /> (Check <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hatge 0-2 <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> I"CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49029. <br /> §2636] 41111. 490-31. <br /> PANEL MANUFACTURER:Veeder-Root MODEL#: TLS 350 <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL# 794380-208 49x33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490.34. <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 491-35. <br /> 2MLIN <br /> . ECHANICAL E LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26367 <br /> 4903-5. <br /> MLLD MANUFACTURER(S): 490-3z MODEL#(S): <br /> ® 3.ELECTRONIC LANE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS.[23 CCR§26361 490.39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-40. MODEL#(S): 0848980-001 49P41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490.42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 11141. <br /> ELLD FAILURF/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO <br /> 490-05. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490.4E7. <br /> 490-48. <br /> ❑ 5.VISUAL PINE MONITORING. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ a MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49. <br /> 'A]11wd for monnorirg oruvbu[d emageory 6meretor fi,elp oe WY o0-FISC 425281.5 3 <br /> 490-50. <br /> ❑ 6.SUCTION PIPING MEET'S EXEMPTION CRITERIA.123 CCR§z6w(al(3p <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. _ 490-51. <br /> ---- 490-52. <br /> ❑ 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.