Laserfiche WebLink
• • oua <br />STATE OF CALIFORNIA G °+, <br />STATE WATER RESOURCES CONTROL BOARD i <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B W ��° <br />r <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. c�`��°°��� <br />MARK ONLY 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT ❑ <br />5 CHANGE OF INFORMATION ❑ <br />7 PERMANENTLY CLOSED ON SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT ❑ <br />6 TEMPORARY TANK CLOSURE ❑ <br />8 TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />So7,0 11_ i;Aa >` <br />D A fti ro <br />Gc>v <br />❑ 3 CHEMICALPRODUCT <br />❑ 95 UNKNOWN <br />® 2 <br />WASTE <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I.D.# <br />© 4 OIL <br />O <br />B. MANUFACTURED BY: Pdc <br />C. ❑ 1aR ULAR <br />G L <br />❑ 2 PETROLEUM <br />C. DATE INSTALLED (MO/DAY/YEAR) <br />/� - <br />PRODUCT <br />D. TANK CAPACITY IN GALLONS: <br />CSD <br />❑ 3 CHEMICALPRODUCT <br />❑ 95 UNKNOWN <br />II.TAMKCONTENTS IFA -11S MARKED. COMPLETE ITEM C. <br />A ❑ 1 MOTOR VEHICLE FUEL <br />© 4 OIL <br />B. <br />❑ 95 UNKNOWN <br />C. ❑ 1aR ULAR <br />❑ 3 DIESEL ❑ 6 AVIATIONGAS <br />❑ 2 PETROLEUM <br />❑ 00 EMPTY <br />❑ 1 <br />PRODUCT <br />❑ 1bUNL <br />OL <br />JET FUEL ❑ 7 METHANOL <br />❑ 3 CHEMICALPRODUCT <br />❑ 95 UNKNOWN <br />® 2 <br />WASTE <br />AID D <br />❑ 2 LADED <br />❑ 5 <br />❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME <br />OF SUBSTANCE STORED <br />Wow s <br />i 0i L <br />❑ 99 OTHER <br />C. A. S. #: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C. AND ALL THAT APPLIES IN BOX D AND <br />A. TYPE OF <br />® 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />❑ 99 OTHER <br />B. <br />❑ 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />E)3 FIBERGLASS <br />4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 9 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />4 FIBERGLASS PIPE <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING <br />X 6 UNLINED <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U <br />6 CONCRETE A07 <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO_ <br />8 100% METHANOL COMPATIBLE W/FRP <br />D.CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑K 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONEq <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />�. <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) s <br />IV. PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND. BOTH IF APPLICABLE <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />A U <br />2 PRESSURE A g3 <br />GRAVITY <br />A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A(y <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />A U <br />1 BARE STEEL <br />A U <br />2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC) A U <br />4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U <br />6 CONCRETE A07 <br />STEEL W/COATING <br />A U <br />8 100% METHANOL COMPATIBLE W/FRP <br />PROTECTION <br />A U <br />9 GALVANIZED STEEL <br />A U <br />10 CATHODIC PROTECTION <br />A U 95 UNKNOWN <br />A U <br />99 OTHER <br />D. <br />LEAK DETECTIO <br />AUTOMATIC LINE LEAK <br />DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 0 <br />IIT ERSTITAL <br />MONITORING <br />❑ 99 OTHER <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING ® 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST U ED (MO/DAY/VR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YESNO <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? ❑ ❑ <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />APPLICANPS NAME DATE <br />I6gINTEDdSIGNAjNRE) /� n ^�.2S n( <br />6S nl/AF A/,),,L n.,A4 L A.✓V 0 //.0/ ./ /i//A, ,/ O 7J <br />LOCAL AGENCY USE ONLY THE STATE I.D. NffMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />0 0 <br />F0R0070&R5 <br />COUNTY# <br />JURISDICTION# <br />FACILITY# <br />TANK# <br />Q <br />STATE I.D.# <br />m <br />0 <br />0 <br />91111.2 <br />PERMIT NUMBER <br />PERMIT APPROVED BY/DATE <br />PERMIT EXPIRATION DATE <br />FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />0 0 <br />F0R0070&R5 <br />