My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:28 PM
Creation date
11/5/2018 4:48:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\192\PR0505867\INSTALL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Keyed Notes <br />I <br />_35"Vr <br />2°9 <br />47-11 vz� <br />4L7 <br />- t - T `, .-a•-s°-a-+tuz.- 6-611z f---e•-settra•-ntrrka-6^-: <br />/ •-61/2" , <br />\ 1 <br />®i�ember 151and Layout; <br />Fuel Piping Flan 1" =10' <br />1. Install 3 ea. 20,000 gal. & 1 ea.12,000 gal Modern Welding Type 16 double wall otoraga tanke with Glaeateel fiberglass coating- Install tank <br />hold down straps and vertical deers as per hold down details. Slop tanks 11/2" Minn. and 3" max. to fill and of tank. All fill material to <br />be clean washed pea gravel. (Typ[ca14 ea.) <br />2. Install American Containment fiberglass containment sumps for turbine pump and piping connecuono. Sump to reduce to 32" lid and have <br />a 36" Universal manway at surface. SumRto have installed a piping oumEpnobe wired for syetem shutdown upon detection k oAuct All <br />penetrations to be maid with Environ water tight fittings. Croom all manways 1" abova seJacent concrete elevations. (Typical 4 Ea.) <br />3. *'x 2" x 2" extractor assembly, for connection of 2" vapor return line and 2" vent pipe. (Typical 4 ea.) <br />4. *'fill aoaambly. with EDW 15 gal oversplll containment bucket, OPW 95% overfill ehutoFF drop tube aseembly., Emco Wheaton fill cap and <br />adapter all manways 1" above adjacent concrete elevations. (Typical 4 ea.) <br />5. 4" vapor return with EBW 5 gal overspill containment Bucket, OPW dry -brake and cap, Crown all mamwaye V above adjacent concrete <br />clevatlone 4 ea.) <br />6. Tank annular space riser assembly. with 12" manway and tank monitoring probe. Annular spare probe to be wired for system shutdown upon <br />detection of product. Crown all manwayo 1" above sAjacent concrete elevations. (Typical 4 ea.) <br />7. Run new 2" single wall Smith Fiberglaee vent Ione to a new vent stand at aide of staging area. Vents to ba at least 12' above ground. <br />Install Hasstech pressure vacuum vent valve and manifold all gasoline vent lines as per Hasatech requirements. All lines to elopes back to <br />piping sump at 1/8" per footfall min. <br />8. install new 2" single wail Smith Fiberglass Haestech VacuRite source and return line from drain check to Processing unit and from <br />Processing unit to lowest octane vent line. <br />9- Haootech VacuRite Thermal Processing unit and Dual Vacuum Collection unit mounted on a equipment stand with rain shield. <br />10. Install Haeatech VacuRtte In -tank drain valve and Trap. All piping penetrations to be maid with Environ water tight fittingo. <br />11. Install 3" vapor manifold between all take. Connect all] gasoline tanks to manifold. Cap diesel vapor line Inside containment sump. <br />12- Install new Z'& 3"A-0 Smith II flberglaso product piping with W& *'A-0 Smith secondary containment piping., Install new 2" and 3" <br />vapor and recovery piping with 3" and *'A-0 5mith Secondary containment vapor piping. All piping to slop back to tank at si minimum <br />of 1/8" per foot, The main Unload piping run from tank to the last piping Tee at the third island will be 3" primary piping and 4" <br />secondary piping to facilitate higher possible flow rates. <br />13. Manifold all Annular spaces to a common 2" vent line and run new line to vent stand. Terminate vent riser at 12" above our -Pace. <br />14. Install new 36• x 5' x 13" dog -bone dispenser island with 12" wide x 18" tall metal / concrete barrier at each end. (Typical 4 ea.) <br />15. Install new canopy foundation at center of new [eland. Canopy to ba Installed by canopy contractor. (Typical 8 ea.) Note: ate Canopy <br />Plans for location <br />16. Install Bravo under dispenser containment baxas for new Tokhelm Dfapaneer at each dispenser location. Each dispenser to have <br />Installed Haeetaoh flow control valve kit. (Typical 12 ea.) <br />17. Install American Containment fiberglsea containmont sumps for tank gauglme under new 36" Fomsco mamvay. Crown all manwraye V above <br />adjacent concrete elavation& (Typical 4 on.) <br />18. Install new 12" thick tank elab with six sack cement and # 4 rabar 12" on center. no mbar Into tank hold down system as per hold down <br />plan. Match existing asphalt grades. Concrete to be natural in color. <br />19. New 40• x 120• canopy Installed by canopy contractor. <br />20. New drive slab, 6" thick 6 sack concrete with water reducer, #3 rebar on 18" cam r% natural in color. <br />21, 1/2" x 6" deep felt Joints. #4 rabar to run eontinuee acrosojoints. <br />22. 1.1/2" deep tooled concrete Jointo. #4 rebar to run continues aoroes jofnto. <br />23. 4•' and e'A56 storm ciralnage line. Install dean outs at all 90 deg. change of direction. <br />lav <br />fuel bite Man 1" LU' <br />REVISIONS I BY <br />California <br />Petroleum <br />Equipment <br />Inc. <br />PO Box 9364 <br />Fresno Ce, 93792 <br />Office 209-276-1881 <br />Fax 209-276-1894 <br />Cont. Lic. 432613 <br />Type A, B, C-61, HAZ. <br />DRAWN <br />Bryce Ruechhoupt <br />CHECKED <br />DATE <br />05-07-98 <br />seals <br />V=20' <br />JOB NO. <br />SHEET <br />FUEL <br />PLAN <br />F=5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.