My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
9121
>
2300 - Underground Storage Tank Program
>
PR0502518
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 3:45:47 PM
Creation date
11/5/2018 4:50:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0502518
PE
2381
FACILITY_ID
FA0005476
FACILITY_NAME
LATHROP MANTECA FIRE STATION 33
STREET_NUMBER
9121
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20609010
CURRENT_STATUS
02
SITE_LOCATION
9121 E LATHROP RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\9121\PR0502518\BILLING 1985-1991.PDF
QuestysFileName
BILLING 1985-1991
QuestysRecordDate
8/4/2017 5:13:07 PM
QuestysRecordID
3554317
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br /> FORM 'S': UNDERGROUND STORAGE TANK PROGRAM <br /> TANK PERMIT APPLICATION INFORMATION _ z <br /> TANK <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. I <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑5 CHANGE OF INFORMATION ❑7 PERMANENTLY CLOSED TANK <br /> ONE ITEM ❑2 INTERIM PERMIT ❑4 AMENDED PERMIT <br /> ❑6 TEMPORARY TANK CLOSURE ❑8 TANK REMOVED <br /> FARM TANK-YES❑ NO � <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: F � <br /> 1. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN—SO SPECIFY (� <br /> S. MANUFACTURED BY: <br /> A. OWNERS TANK ID# <br /> D. TANK CAPACITY IN GALLONS: 50 <br /> C. YEAR INSTALLED .r7 <br /> 11. TANK CONTENTS IF(A1),IS MARKED,COMPLETE ITEM C.IF(A1),IS NOT MARKED,COMPLETE ITEM D. <br /> B C. ❑ 1 UNLEADED 2 LEADED ❑3 DIESEL <br /> A. 1 MOTOR VEHICLE FUEL ❑ 27EMPTY <br /> M Rz i PRODUCT ❑ <br /> 4 GASAHOL ❑5 JET FUEL ❑6 AVIATION GAS <br /> ❑3 CHEMICAL PRODUCT ❑ <br /> ❑5 HAZARDOUS ❑ ❑95 UNKNOWN ❑ 2 WASTE ❑7 METHANOL ❑99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF C.A.S.0: <br /> HAZARDOUS SUBSTANCE STORED&C A.S.0 <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,&D <br /> A TYPE OF ❑ I DOUBLEWALLED ❑3 SINGLE WALLED WITH EXTERIOR LINER 95 UNKNOWN <br /> �! ❑4 SECONDARY CONTAINMENT ❑99 OTHER <br /> SYSTEM LYJ �SINGLEWALLED <br /> 1 STEELPRON ❑2 STAINLESS STEEL ❑ 3 RBERGLASS ❑ 4 MEL CIAO WIRBERGLASS REINFORCED PLASTIC <br /> B.TANK 5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑ 7 ALUMINUM ❑ B 100%METHANOL COMPATIBLE FRP <br /> MATERIAL ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN ❑99 OTHER <br /> ❑ 1 RUBBER LINED ALKYD LINING ❑3 EPDXY LINING ❑4 PHENOLIC LINING <br /> C.INTERIOREl95 UNKNOWN <br /> LINING ❑5 GLASS LINING 6 UNLINED <br /> ❑ IS LINING MATERIALCOMPATIBLEWITH 100%METHANOL? ❑YES 0N 099 OTHER <br /> D. CORROSION ❑1 POLYETHLENEWRAP ❑2 TAR OR ASPHALT ❑ 3 VINYLWRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑5 CATHODIC PROTECTION ❑91 NONE rV95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A SYSTEM TYPE A 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> S.CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A 95 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> G. MATERIAL A U 5ALUMINUM A U 6CONCRETE A U 7STEELCLADW/FRP A U 8100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEELIQED5 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P S 1 VISUAL CHECK P S 2 INVENTORY RECONCILIATION P S 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P S 5 GROUND WATER MONITORING WELLS <br /> P S PRECISION TESTING P S 7 PRESSURE TESTING P S 91 .ONE P S 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE S.WAS TANK FILLED WITH <br /> 1. ESTIMATED DATE LAST USED(MO/VR) 2. ESTIMATED QUANTITY OF INERT MATERIAL? YES <br /> NO <br /> SUBSTANCE REMAINING IN GALLONS <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNODWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANTS NAME(PRINTED&SIGNATURE) <br /> LOCAL AGENCY USE ONLY <br /> TAGENCY# FACILITY ID# TANK ID k <br /> COUNTY# JURISDICTION# <br /> [ail <br /> 1 �` <br /> CURRENT LOCAL AGENCY FACILITY ID p <br /> APPROVED BY NAME PHONE#WITH AREA CODE <br /> PERMIT APPROVAL DATE PERMIT EXPIRATION DATE <br /> ` PERMIT NUMBER A( <br /> 1 ECK# PERMITAMOUNT SURCHARGE AMT. FEE COD <br /> CHE RECEIPT k BYBy <br /> FORMB(6-29-Be) THIS FORM MUST BE ACCOMPANIED BYAFACIUTYPIO , O <br /> FORM A7,UNLESS, ,.0FORM <br /> 'A'FORA' HAS BEEN FILED <br /> DATAPROCESSING <br />
The URL can be used to link to this page
Your browser does not support the video tag.