My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2109
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LIBERTY
>
21850
>
2300 - Underground Storage Tank Program
>
PR0528163
>
COMPLIANCE INFO_PRE 2109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 4:40:01 PM
Creation date
11/5/2018 4:51:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2109
RECORD_ID
PR0528163
PE
2351
FACILITY_ID
FA0000267
FACILITY_NAME
88 MARKET & GRILL
STREET_NUMBER
21850
Direction
E
STREET_NAME
LIBERTY
STREET_TYPE
RD
City
CLEMENTS
Zip
95227
APN
02120024
CURRENT_STATUS
02
SITE_LOCATION
21850 E LIBERTY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LIBERTY\21882\PR0528163\COMPLIANCE INFO 2008.PDF
QuestysFileName
COMPLIANCE INFO 2008
QuestysRecordDate
8/4/2017 6:19:14 PM
QuestysRecordID
3554456
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a result of a <br /> leaking UST system, it is the responsibility of the owner or operator to submit <br /> a work plan to EHD Site Mitigation Unit prior to initiating any assessment or <br /> remediation activities. <br /> b. To minimize delays, a Corrective Action Plan may be submitted concurrent <br /> with tank closure or installation plans. Address one copy of the Corrective <br /> Action Plan to the Site Mitigation Unit for review. For further assistance <br /> contact the Site Mitigation Unit at(209)468-3450. <br /> B. PLAN REVIEW AND OPERATING PERMIT FEES <br /> 1. New facility plan review fee of$784.00 (8 hour minimum per facility), $550.00 <br /> facility fee (includes one tank), $125.00 per tank after the first tank, plus $15.00 <br /> state surcharge fee per tank is due at time of plan submittal plus $24.00 per site <br /> state surcharge. <br /> 2. New installation of an additional tank at an existing facility is 5784.00 plan <br /> review fee (8 hour minimum per facility) plus $125.00 per new tank after first <br /> tank, and $15.00 per new tank state surcharge fee. <br /> 3. It should be noted that a $784.00 plan review check fee required for each <br /> submittal allows for up to eight (8) hours of staff review and/or inspection time. <br /> Additional time spent on plan review, meetings, inspections, phone or office <br /> consultations will be billed to the applicant at a rate of$98.00 per hour. <br /> 4. The maximum review time for UST installation plans is 40 working days. A <br /> preliminary review will be conducted by the EHD within 20 working days of <br /> submittal date to identify any gross plan deficiencies. <br /> 5. If gross deficiencies are identified, the plans will be returned with a checklist <br /> identifying plan deficiencies. <br /> 6. To expedite the review of installation plans, time and a half per hour overtime <br /> fee may be submitted to have review completed within 10 working days of <br /> submittal date if staff is available to perform the review. <br /> Revised 061108 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.