Laserfiche WebLink
FEE WORKSHEET PER EACH FACILITY <br /> FACILITY <br /> DBA ADDRESS <br /> ,MAILING ADDRESS <br /> 1. Operating Permit Application/Annual Inspection Fee <br /> a. First Tank at Facility @ $150. <br /> b. Additional Tanks (b Additional Tanks x $50) <br /> 2. State Surcharge (per tank) (Due with Permit Application* <br /> on renewal or amendment of operation permit and temporary closure) <br /> ($56 x Total M Tanks) <br /> 3. *Temporary Closure (per tank) Underground Storage Tank in which <br /> storage has ceased but where the owner/operator proposes to <br /> re-use tank within 2 years. <br /> (#_ Temporary closures x $80) (See above f3 to calculate surcharge) <br /> 4. *Permanent Closure (per tank) Underground Storage Tank in which <br /> storage has ceased and where the owner/operator has no intent <br /> of re-using tank , <br /> (N Permanent Closures x $90) <br /> 5. Plan Check Fee $30. <br /> Total Number of Tanks Total Fee Due <br /> Make all fees payable to San Joaquin Local Health District. Enclose this worksheet <br /> with your check. <br /> EXAMPLE - Annual Fee for Facility with 4 Tanks <br /> ( 1 regular, 1 unleaded , l supreme, I waste oil ) <br /> Ia. Existing Facility & 1st Tank $150 <br /> b. 3 Additional Tanks x $50 150 <br /> 2. State Surcharge , 4 Tanks x $56 224 <br /> Total Number of Tanks 4 Total Fee Due $524 <br /> *[loth closures will be conditioned. Contact a Health District Representative. <br /> 2-86 <br /> 0GC al <br />