My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_4_15_94
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
1795
>
2300 - Underground Storage Tank Program
>
PR0231641
>
REMOVAL_4_15_94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 8:35:29 AM
Creation date
11/5/2018 5:01:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
4_15_94
RECORD_ID
PR0231641
PE
2381
FACILITY_ID
FA0003823
FACILITY_NAME
FAA - SCK
STREET_NUMBER
1795
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1795 LINDBERGH ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDBERGH\1795\PR0231641\REMOVAL 4_15_94.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...OSAN SAN JOAOUIN COUNTY <br /> _,. COMMUNITY DEVELOPMENT DEPARTMENT <br /> IBIO E HAZELTON AVE.STOCKTON.CA 95205 <br /> • �' �� DEVELOPMENT SERVICES PHONE 1209)466-3120 <br /> �Ci'itiA� PLANNING PHONE(2091 468-3120 <br /> BUILDING PHONE 1209) 468.3123 <br /> NEIGHBORHOOD °RESERVATION PHONE 12091 468.3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location Stockton Metro — <br /> Owner Tank owner-Federal Aviation Adminis. Phone No. X09 946 6310 <br /> Cortactor Tnm mehr]n er r + Jnn?hone No. 916-527-5014 License No. 7gT77� <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> XX 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 12" lifts: <br /> A. Pea gravel - smooth, rounded material not more than one-half (1/2; <br /> inch in diameter. <br /> B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of cruaSed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer%s Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displaccv�er.t and <br /> that the entire excavation will be backfilled and compacted to insure compliance witn the <br /> Uniform Building Code Appendix Chapter 70. <br /> TOM MEHRINGER CONSTRUCTION, INC. <br /> * Tom Mehrinoer — <br /> Name (Print) <br /> Pres. Owner _— <br /> Title (Print) <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.