Laserfiche WebLink
w <br /> Section 6 Removal of the UST <br /> 6.1 General: <br /> 6.1.1 Scooe : This section includes the removal of one 1000 gallon metal underground, diose► <br /> fuel storage tank. <br /> 6 1 2 Oualificatiens: The Contractor shall be certified by the State of California on el shall <br /> removal of underground storage tanks, Hazardous Materials Certificate. Field pet <br /> consist of a minimum of one foreman with at least two years of experience, and a laborer. <br /> All individuals working on the site are required to have completed the 40 hour and/or 8 hour <br /> update OSHA Health and Safety training requirements, have been fit tested for a respirator. <br /> j.2 Materials: Not applicable <br /> 6 3 Installation: <br /> k, <br /> 6.3.1 Fuel Transfer : {►fter ttte,AST is installed, wswd, and accepted, the Cautr. ,sh_,tt <br /> ZKartsler She tuel from t1 I75T to[he,qg r—^l(re"Cuinuactuc Shall idler 4 viaty; +u,i <br /> sdlid"c from the fuel prior W placing if inttnhe clew 7fST"� No more"than 55 gatlo,i cT �i`ir, <br /> or sludge shall be left in the UST. pisposal of up to 55 gallons of tank sludge and/or water <br /> shall be included in the price of this contract. The Contractor shall dispose of this waste <br /> through a commercial treatment, storage, and disposal facility (TSDF) licensed by the State of <br /> Underground tial <br /> California. Work shall be scheduled such that nansfer of fuel solace from <br /> to new above ground tank will occur in one working shift. <br /> TruckinguTrucking6 3 2 Inertine the T nnkk : Prior to transportation by a separate contractor, H & H <br /> (see paragraph 6.3.3), the Contractor shall inert the UST. If a triple rinse method is used to <br /> inert the UST, the rinsate shall remain the property of the Contractor for disposal. if dry ice <br /> is used to inert the tank for transport, the Contractor is responsible for keeping the tank inert <br /> until responsibility is transferred to H& H Trucking for disposal. <br /> + Tani. piping shall be rinsed pdm-V Aoval of r)te tank• The:` <br /> 633 Removal : -ftp p P g , <br /> � i in and't:anerFte tie dowg_p�fmna-ttie grau�,:::Aflgf <br /> C }or sbaU V IN*o'P P g d <br /> removal, the C4inlractor shall load the irlerted UST and_.. piping Qa to� EF�'"'�"1 b� 1�1e <br /> GQv ,a*ac low for uldmafi'l pos--��a off''Goveriunent Property'.``"1'he rior <br /> contractor shall notify the Government provided tank.disposal company 5 working y p I <br /> to the required removal date. The Contractor shall coordinate the hazardouswaste manifest / <br /> with the tank disposal company. The EPA generator ID number will be p y <br /> P1 <br /> of the FAA. The Contractor shall allow 2 weeks for the FAA to obtain the <br /> Generator ID number. The tank disposal company is: <br /> H & H Trucking <br /> 14 <br />