Laserfiche WebLink
♦.► .wo, <br /> DRAWING NOTES: <br /> 1 The fuel vault shall be a "Convault" or equal in the specified size. It shall be comm[t d of the <br /> 10 gage (mini;num) steel primary container, 6 inch concrete vault with outlet configured <br /> "H" desibm. Incorporate a 6" emergency vent, and have built <br /> riod of 20 years. toction aon (7 gallons <br /> min.). The fuel vault shall have a minimum warranty Pe <br /> calibrated measuring stick is to be provided with the fuel vault. Convault 4109 2erring Road <br /> Denair, California (209) 632.7571. <br /> 2. The tank shall be installed in accordance with manufactures instructions and as tcultcated on this <br /> drawing. <br /> 3, All fuel pipe shall be black iron pipe schedule 40 with 3" FRP secondary containment where <br /> shown. All fuel pipe and fitting not having secondary containment shall be painted with Yellow, <br /> rustoleum exterior enamel. The fitting shall be black iron schedule 40 approved for use with <br /> fuel oil. Al materials supplied shall meet all requirements of NFPA 30. <br /> 4. All fuel piping connection shall be leak tested at 50 psi for a minimum of 2 hours. <br /> 5. Concrete pad will be Quickset bermed type or equal. Guard posts will be placed as shown on <br /> plate 4.. <br /> 6. The fuel vault shall be registered with the manufacturer to validate the warranty and with the <br /> local fire marshall. <br /> 7. The leak detection monitor shall be a vapor-liquid sensing type as manufactured by Mine Safety <br /> d. One <br /> Appliance (MSA) Company. Model 481532 or equal with remote monitoring relay MSA or <br /> vapor sensor 11 be in 82608 arta r manufacturehree liquid rs instructions S2607 as manufactured and as shown on tue drawings. <br /> equal and shall be installed as per <br /> 8. Install vent supplied with fuel vault as per manufacturers instruction. <br /> 9. Seal opening through E/G building wall weather tight. <br /> 10. Pad shall be sloped 1i8" per foot away from foot valve end of than placement. <br /> 11. Monitor conduit. 3/4" RSC above grade shall be painted <br /> as per note 3. Conduit below grade <br /> will be wrapped with 10 mil pipe wrap at least 3 wraps for electrical use rigid STL GAL. <br /> conduit. <br /> 12. Guard posts and unistrut shall be.installed in such a manner as not to be exposed to existing <br /> 13. Fuel tank ground counterpoise will be connected to facility ground by cadweld. <br /> 14. All secondary containment shall be ,,Pipe jacket" as manufactured by total containment or e4i+Wt• <br /> Leak tested 5 lbs or manufactures requirements PLATIE 3 <br /> 0 <br />