Laserfiche WebLink
TOM MEHRINGER CONST . INC . SITE SAFETY PLAN <br /> 4 .0 RISK ASSESSMENT SUMMARY <br /> Using any available analytical data for the site , along with <br /> ts and <br /> published data on the suspected cont=ovidea summarylofrtheon <br /> of all possible exposure routes, p community <br /> potential risks to site workers and the nearby <br /> wever, this section may be updated as <br /> during the project. Ho <br /> data becomes available . <br /> Potential risk to site personnel and surrounding population is low <br /> from hazards associated with this project. <br /> 5 . 0 AIR/GASES/VAPORS MONITORING PLAN <br /> Outline the specific Equipment to be used, calibratior. � eci; d , <br /> frequency of monitoring, locations to be monitored, and <br /> analysis of samples ( if applicable ) . <br /> Tank. gases/vapors to be monitored with Model #1314 Gastechtor <br /> If air monitoring is not be iri:plemented for this cite , explain <br /> why : Air erodetermined <br /> coordinating <br /> county personnel and local ruesEregulations. <br /> 6 . 0 PERSONAL PROTECTIVE EQUIPMENT (PPE ) <br /> Rational for selection of PPE (Rational should <br /> withastheon <br /> available analytical s ggested PPE . This <br /> familiarity <br /> s lection of PPE <br /> capabilities of any <br /> should be made by per experienced in industrial hygiene . <br /> 6 . 1 Equipment (be specific, i . e . , etc . } <br /> hard hats, goggles, boots, <br /> respiratory protection-type, or hearing protection <br /> Protective Clothing, etc: <br /> Head protection- Hard hats during complete operation <br /> Eye protection - Goggles, when deemed necessary <br /> Hand protection - Chemically resistant gloves, when deemed necessary <br /> Hearing protection - Far plugs when deemed necessary. <br /> 3. <br />