Laserfiche WebLink
• � bOVR fg <br /> �v <br /> .LSTATE OF CALIFORNIA <br /> STATE WATER �r ?; <br /> S IA�'y S RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ i NEW PERMIT O 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION O 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT O 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 9 TANK REMOVED <br /> DBAOR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.S 1 B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY7YEAR) Jim D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OILB. C. ❑ la REGULAR <br /> 3 DIESEL 4 GASAHOL g AyIATION GAS <br /> ���--,,,{{{ <br /> 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ 1bUN EIIUMADE ❑ 6 JET FUEL 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ED 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 96 UNKNOWN <br /> SYSTEM -AL 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ///F—] 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 6 GLASS LINING 6 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> LINING 0214 <br /> IS LINING MATERIAL COMPATIB E WITH 100%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING Q 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVEG OUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION 2 PRESSURE p U 3 GRAVITY A U 99 OTHER <br /> '1 B. CONSTRUCTION 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U I FIBERGLASS PIPE <br /> C. MATERIAL AND 0 $2 <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U g 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL <br /> MONRORING Xj 99 OTHE <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ' <br /> 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING E::] 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> NANK <br /> 6 TATESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DAT AST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL? YES E:] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME - DATE <br /> (PRINTED 8 91GNAT➢RE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH)LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK <br /> REGULATIONS <br /> jk,�-56FORMB (12-91) FOR00348-R6 <br />