My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
6364
>
2300 - Underground Storage Tank Program
>
PR0507806
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:30:18 AM
Creation date
11/5/2018 5:09:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0507806
PE
2361
FACILITY_ID
FA0007770
FACILITY_NAME
ATLANTIC AVIATION
STREET_NUMBER
6364
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
6364 LINDBERGH ST 202
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDBERGH\6364\PR0507806\COMPLIANCE INFO 1998-2011.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/07/2004 08:44 209983W STOCKTON JET CENTER PAGE 03 <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN—PAGE 2 <br /> YI'DISPENSER MONIT67PING <br /> naso, <br /> MONITORING OF AREAS BENEATH DISPENSER(S)1S PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: Mri. MODEL#: IS- 1000 Msa. <br /> MODEL tf S : M54. <br /> LEAK SENSOR MANUFACTURER. rCon M57. ( ) 'j"SP- kJ <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS7 Q a.YES ❑ Is.NO mss <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? EA a.YES C7 b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN7 i5k a.YES ❑ b.NO M-" <br /> ❑ 2.MECHANICAL,ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UAC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Mse. MODEL#(S): Mag. <br /> M60, <br /> � 3.VISUAL MONTTORING DONE: 'M a.DAILY ❑ b•WEEKLY(Requirm umuonme+n0 <br /> ❑ 4.NO DISPENSERS Mci. <br /> ❑ <br /> ER(Specify)99.GTH VII. ENHANCED"LEAKDETEMON l: : :, <br /> 1.W E I HAVE BEEN.NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> REFERENCE <br /> DOCUMENTSOUND <br /> ORAGE ELECTRONIC <br /> LING <br /> OOGUMENTS MAINTAINED AT FACILITY Check all that apply) Msn, <br /> TNG PLAN(Required) <br /> 2. OPERATING MANUALS FOR MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 7/12004) <br /> 4. CALIFORNIA UNDERGROUND STORAGE YANK REGULATIONS <br /> 3. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTI•IFR(Spccify): Mst. <br /> Pcmanncl with UST monitoring responsibilities aro familiar with all of the above documents relevant to theirjob duties and can access thnsc documents when needed, <br /> By July I,2004,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July <br /> 1,2004, and armually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> D The facility employee's role with regard to the leak detection equipment, <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> D Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1.2004,the initial training will be conducted within 30 days ofthe date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this acction to include any additional UST system menitanng-related information(e.g.,additional information required by your local agency): Mss. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 7/12004,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILITY FORM WILL HAVE.ULTIMATE AUTHORITY FOR PERFORMING+THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 Cal 2715(b). <br /> X . <br /> OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein Is true And accurate to the best of any Imowled>;e. <br /> OWNERIOPERATOR SI NATURE REPRFSFNTfN DATE: Mal. <br /> ❑Owner Mao. Zoe H <br /> �..✓<- Operator <br /> [R <br /> OWNBR/OPERATOR NAME(print); M0Z' OWNER/OPERATOR TITLE: M97. <br /> z f EAp wni Lrc— elJe Al — M &v— <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Sleccial Conditions: <br /> SJGF:HD-d(07/03)-314 07/73/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.