Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> Dft`( �- [� � 360 X65 MrMM.u,vt <br /> b. Tank/Piping Hauler: Q <br /> Name ST C.,©f i LGJ I P"^�1 c !1 -7 f 2-31 <br /> Address �.0. Pj(�Y. Z�jb J t:'jVR��L `�gL3e l <br /> q 2 3,- Zip _ <br /> Phone No.( <br /> Hauler Registration#(if hauled as hazardous)L, <br /> C. Tank/Piping Disposal Site: <br /> Name eQ b101 tA/F- <br /> Address City Tyg puL Zip 0 <br /> PhoneNo.( q <br /> Z� 6- -� 137 <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES p0 NO [] <br /> 9a. Describe,in detail,how the soil and/or water sample(s)beneath th tank and piping will be obtained: <br /> erVE So rL- F oM o 1 fd O+J W A-6 <br /> " L04 s "tort 'wt en1D rN Cf�S+�tlQl14� <br /> [CC- 0 5 JNI1crL N 0 L.6jQR lVM&a <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Met Cti-i6 -fD WrfI IN TO OF 5X)"- C-;CoJciLO' FIu� &IL' P� <br /> AiJO Co ntiO�f R ° o F ry[ fit ; P_M N� M2 Fv�.t..ow �A'r6C <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> V [S4A-C-N <br /> b)What will be the final destination of the excavated stockpile? <br /> iF �cc�trJ 0se fts 3ftmFrIA�` D�-AtoftfW --1b FD(RWj o 1-4WFOw <br /> c)Contaminated Soil Hazardous Waste Hauler: CA <br /> 5�`�,1Q p�,�,� rpA�CAoq�ZSi363z- <br /> Name VCIV V�� jS'F1}���p� n1l0N ,H'a1uler Registration# DT SCa 2-�77gQ <br /> Addressy� regm— �NILT- City WINOSO(� Zip <br /> Phone No. ( -7D-7 ) g 3 D — 1 / 07 <br /> EH 23 046 (Revisedl0/16/03) Page 5 <br />