Laserfiche WebLink
REVISIONS BY <br /> DIVISION OI - 6B49;tAL REGUIREMBNTS, 6ASOLJNE TANKS, PIPIRSAND RELATED EAUIPI-TENT _,__, __W,,,_ _PFAU-TCL7 <br /> 1. ALL CONSTRUCTION AND WORKMAN54IP ON THIS PROSC.T SHALL `'b/� PIPINGn FOR F-MWRO�WGT VENTS VMO > ,FLAIL BE PIBER6LA PIPE WITH FLEJ(IBI;E �TM"ELECTRONIC MONITOwH6"78-1B'p.}I� THE 5Y5TEM 15 <br /> COMPLY WITH ALL STATE AND LOCAL CODES ARID ORDINANCES IN COMPETE AND HA5 BEEN PURGED OF AIR BY REPEATED OPERATION THE OPERATION OF THE TWO PRESSURE GAUGES,AS REQUIRED IN TESTING SECTION <br /> EFFECT AT THE TIME ST RECENT <br /> CONSTRICTION, INCLUDING, DDISPENSERS <br /> S EASE OL DIVISION APPLIES T THIS MS AS N OLWER WILL DR A H TAW RI5ER5 USED IL TERMINAL.ENDS FOR STUNG JOINTS. BLACK STEEL PIPE SHALL T USED FOR ELECTRONIC MONITORING SYSTEM WILL BE CON'YJCTED IN ACCORDANCE WITH THE PARTIOL AR OF TIE UNDER6ROAD TAW AND PIPING SPECIFICATIONS. <br /> THE LATEST AND MOST RECENT VERSION OF, THE CONTRA AND ANY OTHER RELATED ITEMS D MARKED ON A14 DRTHER II '45 NO FED BY OWN82, TANK RISERS FOR FILL,VAPOR 6A66E,AND INSPECTION INTERIOR O ALL PIPING MUST BE KEPT MANUFACTURERS DIRECTIONS. THIS TEST 15 TO BE CONDUCTED IN THE PRESENCE OF THE OWER5 <br /> UNIFORM MECHANICAL <br /> BALDING CODE-E-I EDITION THE CONTRACTOR SHALL FURNISH ALL PIPE AND FITTINECESSARY <br /> AND ANY OTHER ITEMS NOT LY OPER IO THE FREE FROM DIRT,SCALE,FETAL R EQUIPMENFIBERGLAT <br /> RESULTING <br /> FROM <br /> ETC. E16NRACTOR WILL BE RESPONSIBLE REPRESENTATIVE AND AN INSPECTOR FROM THE PERMITTING AUTHORITY. APPLY AIR PRESSURE(30 PS MAX)ON ALL THE LINES, <br /> UNIFORM MECHANICAL CODE-1994 EDITION 6A50LIPRAKN65 IS BEING FURNISHED BY ONSER BUT NECESSARY FOR A COMPETE AND FULLY OPERATIONAL FOR DAMAGE TO PUMPS OR OTHER E UNSEALED RESULTING FROM FOREIGN MATERIALS LEFT IN ULE5. THIS PRE59AZE SHELL REMAIN ON All LYES UNTIL PAVIN6 <br /> UNIFORM SECURING CODE - 1994 EDITION PERMIT FE DISPENSING GASOLINE <br /> NO OPEN PIPE UN7A SHALL BE LEFT UNSEALED DURING INA DEPT TIONS O THE WORK. <br /> UNIFORM SECURITY CODE- 1994 EDITION PERMITS FOR THE GASOLINE TAWS AND DISPERSING UNITS HILL BE OBTAIN® BY CONTRACTOR PIPING SHALL RUN AS SNONN ON THE GENERAL PLAN AT A DEPTH OF NOT LESS THAN 18 INCHES 15 COMPLETED. <br /> NATIONAL FlRE CODE - 1994 EDITION CONTRACTOR SHALL OBTAIN AND PAY BELOW SURFACE OF DRIVENAY. A FLEXIBLE CONNELTOR OR SHING JOINT 5HAL.L BE INSTALLED HARE SHOULD E NO L055 of FREPSIRE DURING THE <br /> NATIONAL ELECTRICAL CODE - 1995 EDITION FOR ALL OTHER PERMITS,LICEN5E5,ETC., INCLUDING TESTING AMD SEALING OF DISPENSERS AS 13ETVM EACH 5WHER6ED PIM'AND ITS HORIZONTAL RUN OF PRODUCT PIPING. FLEXIBLE_ Sl6MITALS REMAINDERESHO D CONSTRUCTION <br /> TITLE 24 STANDARDS REIGUIRED BY HEIGHTS AND MEASURE`' A THORTIES. CONNECTORS .MALI.AL50 ENE INSTALLED BEEAT14 EACH DIS SHEAR VALVE. SUPPLY SUBMITTALS TO WILDING DEPARTMENT <br /> SAN JOAQUIN COUNTY WILDING DEPT. ALL UNDERGROUND OR OTHER CONCEALED WORK L BE INSPECTED AND APPROVED BY '•"'""'"'""-"^--. - -� '"""'.""'-•"""a"""-`• INCLUDE MAIFACTURERS CURRENT CATALOG, TAILS-FILLNMOR CONTAINMENT 5/NP <br /> SAN JOAQUIN COUNTY HEALTH DBT. ONtERS FIELD REPRE'5EN7ATINE BEFORE BEING COVERED OVER. CONTRACTOR SHALL BE LIABLE AL.P120OCT,VAPOR RECOVER,AID VENT LI1F5 SH4Vl SLOPE TO DRAIN BACK TOWARDS T INSTALLATION MANUAL AND WARRANTY FOR EACH SUPPLIED ITEM, <br /> CITY OF STOCKTON FIRE DEPT. FOR ANY AND ALL IAND(E SETTLEMENT AND SHALL REPAIR AT HIS EXPENSE ANY DAMAGE RESULTING WITHOUT TRAPS AT 1/e'PER FOOT. ____ SHOP DRANNGS, SUBMIT CAN'PI.EIE SHOP FABRICATION AND FIELD SPILL CONTAINMENT BUCIKETS A7 THE FILL AND VAPOR <br /> �__,..._.._.�_. - INSTALLATION SHOP DRANN65 AND DATE.FABRICATION <br /> SHALL INCLUDE RISERS SITU.E TOTALED AND TESTED <br /> THE FROM FORA PERIOD X ONE YEAR NITER ACCEPTANCE of THE WORK. (LADLE SETTLEMENT �'�"� --� ALL CRITICAL SHOP <br /> AND SHOW LOCATIONS 6 ALL LL I NI65 RISERS THE PIPING STALLED A v! <br /> SHOUT BE SETTLEMffiNT IN EXCESS of I INCH). NO GA50LJ E VINE R5E'R SHALL BE LESS THAN 10 FEET NFA5WED HORIZONTALLY FROM A HEATER Cc O <br /> 2. CONTRACTOR AND O 6044RZBIMCONTRACTORS ARE TO REFER TO ALL SHEETS/ FLUE OR WILDING FRESH AIR INET OR 5 FEET MEASURED HORIZONTALLY FROM ANY OTHER WILDINGToRs All.R5ER5 SHALL BE N6RAPPED. <br /> DRAWEER PRIOR 70 GOMffi NS. IF, <br /> OF WORK TO ELIMINATE POSSIBLE _ OPENING. PIPE 5NN65 SHALL BE INSTALLED ON VENT PIPING AT THE TANK5 AND AT THE RISERS. COPIES OF UFEACTURERRSS LATEST CAUBRAT10NN CCHARTS FOR LEA Ut <br /> CIO <br /> FUTURE ERRORS AND OMISSIIN THE OPINION T THE "\ TANK CAPACITY AND DIAMETER SPECIFIED EXPLOSION PROOF JACTION BOX.MALL W ACCESSIBLE O IN <br /> CONTRACTOR O SUBCONTRACTOR,INEDINTSEINSTRUCTIONS,DETAILS TI PIPE SNN65 SHALL CONSIST OF TWO 40-DEGREE H.BOWS WITH A 6 INCH LONG HORIZONTAL NIPPLE 07 <br /> INFORMATION CONTAINED D THESE COMPLY T1 SPECIFICATIONS OF TIE fL <br /> �� BETNEEN ELPAWS. NO CLOSE NIPPLES SHALL BE U5W. DOUBLE WALL FRP UNDERGROUND FUEL- STORAGE FROM THE MANHOLE,NTHIN 24P OF FINISHED GRADE. Lr) <br /> co <br /> IS AT VARIANCE WITH ,H DOES NOT COMPLY WITH ANY OF TIE BE FIBER6LA6S OF A MAKE 51OWI ON-THE DRAWINGS -----�,r---y.--- �a...,,y.�-^-+ d"'""'°MCMC°"""'C"" - """•rr'""' " ^'^""""""'""REQUIREMENTS ABOVE,HE SHALL REPORT TIE SAME TO THAN: 71CONTANEBNT 5U-PS MUST BE KEPI CLEAN AND FRE£ <br /> DE516N1ER BETORE PROCEEDING WITH THAT PHASE OF TFE WORK. BE MANIFAGTLRFD BY 'FLUID WNTAINP7ENT INC'' OF CONROE, TE%!v'. FlBERW65 PB'INb,SPECIFIC IN5TN.l.ATIOW yT T +BE 'ti'ID CONTAIN ATN;'PO;;WALL FIBERbI— OF D®RIS AT ALL TIME. t , <br /> !T ALL PRIMARY AND SECONDARY PIPING SHALL BE 'HERON WALOY LOX 3000 T (}FP)"fi�71FiU"flE REQUIREFENT5""OFUC J <br /> 3. ON-51TE FIELD VHRIFIGATION OF ALL DIMENSIONS AND CONDITIONS '1.` F . �-1 ALL PRIMARY AID 5ECONH7PRY FITTIN65 SHALL HE CAMERON WALOY LC%3000 ANP MIL-SPED MIL-T-T-52T"AND SHALL HE CONSTRUCTED OF IGO% <br /> SHALL IO S T KERESPOSIBILITYRECEDEN OF OVER <br /> GENERAL CONTRACTOR NOTED 'TION " REINFORCED BOXY RESIN PIPING,ONAhERON 'PUALOY 3000W POLYESTER FE51N AND 6LA55 REINFORCEMENTS WITH NO SAND FILLERS. TAWS-CONTAINMENT SUMP PENETRATIONS � <br /> DIMENSIONS TAKE PRECEDENCE OVER SCALE. C-0NTRACTOR/ONPNER � "- METHANOL COMPATIBLE, INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. STRUCTURAL. R85 SHALL BE INTEGRALLY CAST WITH THE WALL,NOT PERPENDICULAR PENETRATIONS OF CONTAINMENT SR4P WALLS <br /> SHALL VERIFY CONTOURS PRIOR TO CONSTRUCTION ALL OTHER UNDERGROUND VENT AND VAPOR RECOVERY PIPING SHALL BE AMERON SINGLE WALL SECONDARILY BONDED . TANKS SNALL BE CAPABLE ARE PREFERRED. LL <br /> FIBER6LA55 TAW INSTALLATION, FIBER6LAS5 TAWS ARE 70 BE INSTALLED PER MFG,REGUIRE-EiNTS. OF SUPPORTING THE EXTERNAL HYDROSTATIC PRESSURE OF AN EMPTY 20 DE6RE3.5 15 THE MAXIMUM A.LOKAB E PENETRATION ANGLE yy <br /> 4. OMISSIONS, IN THE EVENT CERTAIN FEATURES OF THE CONSTRUC- INSTALLED IN ACCORDANCE NTH MANUFACTURERS INSTRUCTIONS, TANK BURIED IN THE GROUND NTH l FET OF OVERBURDEN, HOLE ALL SAP PENETRATIONS SHALL BE WATER T16Hi. SEAL THE <br /> TION ARE NOT FULLY SHORN ON THE DRAIN65,THEIR CONSTRUCTION THE DRANIN65,AND TH15 SPECIFICATION CONTRACTOR 15 ALL PIPE 15 TO BE SET ON PEA GRAVEL TO THE GRADIENT REQUIRED, YMOR. NAS AND FILLY FLOODED WITH A SAFETY FACTOR OF AGAINST GENERAL WCKLIN6. WT51DE OF EVERY PENETRATION BOOT. W 7 <br /> 5HALL BE OF THE SAE CHARACTER AS FOR SIMILAR CONdDITIONS COMIPLETEL.Y RESPONSIBLE POR THE INSTALLATION AND HE IS TO BE AWARE OF TH05E JOB VENT LINES,PARTICULARLY,MUST BE INSTALLED NTH A POSITIVE 6T•A&E BRA TANK 5URFAGE+2O AXLE LOADS MEN G Z <br /> THAT ARE SHOVE ON THE DRANN65. CONDITIONS WHICH GOULD HAVE AN ADVERSE EFFECT AND REQUIRE THAT HE ADVISE U IANC$-TRBINE RU-AP CONTAINPE}Ni <br /> ONA ,R.FIELp�IiGIN A,FOR,1ILt`i�lr(,7ION,5,@EEFR.EI'Li44 711 THE CONTROL BACKFILL IS TO BE PEA GRAVEL. PROPERLY IN5TA11ID TO MAN,FAGMtERS CURRENT INSTALLATION INSTRUCTIONS. <br /> T$�CARIO 7415 SPECIFICATION AND TFA DRAWItf6�FHE F`O'R"bNltS DETAILS, TOOLS I1�iED 7'O TAPER THE PIPE MUST MATCH THE FITTINGS BEING USED. A 5 P51 AIR PRE55URE LEST APPLIED TO THE PRIMARY AND SECONDARY FINISHED GRADE. <br /> 6VVALVB SHALT. BE EASILY ACCESSIBLE FROM THE O O <br /> 5. THE DRPYUNGS AND SPECIFICATIONS REPRESENT THE FINISHED AND THAT THE MANUFACTURERS RECOMMENDATIONS YA41CH ACCOMPANY EACH TANK TAKE BLACK STEN. FITTINGS USED FOR CONNECTIONS AT THE TANK AND DISPENSERS' ARE 7o BE TANKS NTH SO SAFETY FACTOR A FACTORY 115 INCHES NARCURY <br /> 5TRUGTURE. ALL BRAC INS, TEMPORARY 5UPPORT5,5HORING,ETC. 150 FS M AO MUST BE WRAPPED WITH A TAPE 5X44 AS 050 5WTCHMHRAP A L-NEATNER VACUUM TE5TTANC SHALL BE CAPABLE OF STORING BA APPROVE? C,R) <br /> PRECEDENCE,AMD MUST 13E FOLLOHED IF THEY DI CONTROL TANKS ` E-i <br /> 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR OBSERVATION ON THE JOB 517E p INSPECJ FQIt.7)AH9( „ VISIF)LE17 6E 15 TO BE D 00 MF5 hNCKNE5i)AS MANUFACTURED BY 3M COMPANY OR EQUAL,APPLIED MWF-LAPPED FUELS AT ABIENT TEMPERATURES LIMITED TO GASOLINE,GASOHOL, c <br /> VISITS TO THE JOB SITE BY THE DESIGNER DO NOT 7}EDgiVF]�y"REDE'IPf'ANfi OM R3�E ENGINEER NOTIFIED THE FACTORY IMMEDIATELY. TO PROVIDE 20 MILS THICKNESS. THE MAPPING IS TO EXTEND ONE FOOT ONTO THE ADJOINING ETHANOL OR ETNANOL./6ASOLINE BLENDS,METHANOL OR <br /> INCLUDE INSPECTION OF CONSTRCTION PROCEDURES, THE FIBERGLASS PIPE PETRNOL/6A5OLINE BLENDS,MTBE ADDITIVE WITH GASOLINE,JET FUEL, AFHULTS <br /> CONTRACTOR 15 SOLELY RESPONSIBLE FOR ALL CONSTRUCTION HEATING PADS ARE TO BE USED,EVEN IN MILD MATHBi,TO HASTEN TAE SET OF 7}E JOIN CEMENT. AVFPAS,KEROSENE,DIE58_RL,MOTOR OIL PITH OR NTHOUT TANK LEGIBLE A5-0UILTS ARE TO EA COMPLETED PRIOR TO <br /> METHODS AND FOR SAFETY CONDITIONS AT THE WORK SITE. THESE HAWUSING W.LIFT THE TANK N NOT 76 BE ROLLED OR DROPPED. I7 15 To BEEGRAHANDLED MERE SUPPORTS ARE USED TO MAINTAIN GRADIENT,ETC,THEY MUST BE OF PBZM MNT MATERIAL; WATER BOTTOMS, BACKFILL INCLUDE ALL PETROLEUM,UTILITIES,AND <br /> Z Q �' <br /> VISITS SHALL NOT BE CONSTRUED A5 CONTINLOII,S ARID DETAILED UTO 13 LIFTING ED T O GUYS,AND POSITIONED GENTLY. IF LETT ABOVE GRADE, IT 15 WOOD 15 NOT PERMITTED (OBTAIN PRIOR APPROVAL OF MATERIAL FROM ARCO FIELD ENGINEE TANKS) SHALL BE WARRANTED FOR 30 YEARS AGAINST FAILURE DUE TO INTERNAL.OR CONDUIT LOCATIONS. PROVIDE TRENCH HIDTAS AND CO <br /> INL',PECTIONS. to LI CHOCKED A KI WITH OLD TIRES AND TIED DONE NTN ROPES 70 PREVENT R BEFORE INSTALLATIONN1. SUPPORTS MUST NOT REST ON THE SHBJ.OF A FIBERGLASS TANK OR ON EXTERNAL CORROSION AND STRUGTWAL FAILURE HEN PROPERLY INSTALLED DEPTHS,CONDUIT COUNTS AD REFERENCE DISTANCE <br /> ROLLING IN A WINO. CY) <br /> BACKTILL THAT WOIA-D 17RAN5M11T A LOAD ONTO SUCH A TANK TANK SHALL BE 12DO0 GALLON NOMINAL CAPACITY, � FEET IN FROM A FIXED 517E OBEX-(,T. IE WILDING OR CANOPY. L (fl <br /> 6. DE516K MATERIALS,EQUIPMENT,AND PRODUCTS OTHER THAN THOSE USE A PIPE THREAD COMPOUND SUITABLE FOR GASOLINE,METHYL AFD ETHYL ALCOHOL FOR DIAMETER 1W1 TANK 5RAVE(2) 22 INCH DIAMETER KV44AY. MANNAY SHALL 1-' <11 <br /> All THREADED JOINTS IN PIPE AND IN TANK FITTINGS. TANK FITTINGS MAY REWIRE THAT HAVE (4) 4 INCH NPT PI-MN65 IN COVM SHELL WALL SHALL HAVE 11 <br /> DESCRIBED IN NOTES OR INDICATED ON THE DR OVAL 15 OMAYBTAINED <br /> BE MINIM PLL P <br /> CONSIDERED FOR USE,PROVIDED PRIOR APPROVAL 15 OBTAINED FROM PIPE OUD BE USED E S FEMALE DREADS AS HELL Ar THE MALE. CEENT FOR FIBERGLASS MANUFACTURERS STANDARD NUMBER OF FITTINGS ALLOYED FOR SPECIFIED MINIMUM OF B'OF PFA GRAVEL BACK FILL COVER 15 W C..7 .-N <br /> 7E5'HN& ._._ FIFE JOINS SHALL W A5 RECOMMENDED 6f THE MANUFACTURER SIZE TANK.TANK <br /> THE OWER DESIGNER ARID THE APPLICABLE GOVERNING -- REQUIRED FOR ALL PETROL,-FUM PIPING. ' 1 ' Z <br /> CODE AUTHORITY. FWI- <br /> 1SL HAVE(1) 42 INCH DIAMETER X b INCH NIGH FACTORY INSTALLED i� <br /> FLUID CONTAINFBfT TA9:SRANKS ARE SHIPPED NTH A CONTINUOUS VAC" 1GiTM6 OF 6A50LNE PIPING SECONDARY CONTAINMENT COLLARS SURROUNDING EACH MALNWAY. _ <br /> 7. PROVIDE COMPLETE, IN PLACE PUB_ STORAGE AND DISPENSING ON THE TAW CAVITY, MICE 15 TO BE LEFT ON UNTIL TIE TAW 15 AIR TESTED. RELEASE �' TAMC-il'6 //� to � <br /> SYSTEM AS INIDICATED ON THE DRAWINGS AND SPECIFIED HEREIN INCLUDING THE VACUUM PW AND TIGHTEN ALL FITTINGS. FOR ALL TESTIS INSTALL THREE GAUGES,ONE BEFORE BACKFILLING ALL PRODUCT PIPING,AND ONLY PRODUCT PIPING,FOR THE SUBMERGED `J <br /> BUT NOT NEGE55ARLY LIMIER TO. GASOLINE PEP,SYSTEM 15 TO BE TESTED AT 15 PSI PRESSURE POLE ISOLATED FROM TAW TANG SLAB 5HALL HAVE A HEAVY BROOM FINISH AND BE SEALED. <br /> UNDERGROUND FUEL STORAGE TANK AND ALL RELATED TANK TRIM UNDERGROUND T THE AIR SUPPLY FITTING,ONE AT A MONITOR FITTING,AND ANOT9ER AT A MANIFOLD BETYEEI (BY CLOSING VALVE IN MEAD OF SUBMERGED PUMP AD BEFORE INSTALLING LEAK DETECTOR U PIW RVAID STORMIE TAWS Z L <br /> PRIMARY AND SECONDARY FIBERGLASS PIPING,LEAK DETECTION THE INTER AND OUTER TAKK,USING GAUGES WITH 1/4 TO 1/2 M INCREMENTS, NEIGH COULD BE DAMAGED AT THIS PRESSURE) SOAPING ALL JOINTS AND FIFFIN65. TEST ALL EXTRA AD UNUSED TANG PSBR N.P.T. FITTINGS NRALL BE NO 12,000 NIM RICAL NA'BER SHOULD BE IMBEDDED IN THE <br /> GONEGT A MANIFOLD NTH A VALVE AND 6A116E BETWEEN THE INNER TANK CAVITY COMPLETED SYSTEM NTH DISPENSER AND PUMP INSTALLED. PRESSURE I5 TO BE FLL66M AND SEALED TANK SLAB HHICE DE5CRBB THE TANK SIZE, W � <br /> AGCE55SYSTEM,AUTOMATIC TANK GAUGE, ONA8OLE5,PRODUCT DISPENSER, AD TIE SPACE BE7NEETN THE I NIER AND OUTER TANK. _ MAINTAINED FOR A PERIOD OP I HOU, CONTRACTOR WILL MAINTAIN A DAILY LOG OF All TESTS THERE MUST BE 1/4"PER FOOT SLOPE AWAY FROM EACH <br /> A4GE550RY FITTINGS, INSTALLATION OF TANKS AND PIPING SYSTEM -� •- ^'"'`T-�- (SEE CA50LINE PIPING TEST AFTER PAVING BASE INSTALLATION(3.07,BELOHIJ. A MINIMUM OF 6 1/2'DISTANCE BETN�N PIPING AND BETV�NMANHOLE. <br /> ALL REQUIRED PERMITS,GERTIFICATION5,AND INSPECTION STB I, WITH MANIFOLD VALVE CLOSED,PIRETSSALI TANK TO <br /> 8. INSTALLATION 5HALL BE IN COMPLIANCE WITH PETROLEUM EQUIPMENT INSTITUTE 5 F51 MAXIMUM. TIE TRENCH SIDE WALL AND PIPING SHALL BE MAINTAINED. <br /> PUBLIGATIONS RPIOO,AND RP300, STB 2e CLOSE THE AIR SUPPLY VALVE PND DISCONNECT AIR SUPPLY, TEST VENT,VAPOR RECOVERY AFTER CONNECTION TO TANK, """"�""'"�"'^�""'"" ^ MARKERS SHALL SAY 100 AVIATION LOW IFAD <br /> NEPA JO,30A AND 31 AND ALL MANUFACTURERS CURRENT INSTALLATION STB 5, PRESSURIZE THE CAVITY BEhEEN THE INNER AND OUTER TANK AND ALL CONNECTIONS AID OPENINGS AT TAW NTH NOT OVER 5 PS PRESSURE USING TWO PRODUCT,VAPOR RETRhI AND VENT PIPING SFIA1 SLOPE I/8' tY <br /> 70 5 P51 BY GALGES CALIBRATED NO HIGHER THAN 10 PSI. WEN TWO TAWS ARE TIED TOGETHER NTH PER FOOT(MIN" TOWARD THE 5TORA6E TANKS, <br /> INSTRUCTIONS OPENING THE VALVE IN THE MANIFOLD. DO NOT CONNECT THE AIR SUPPLY AN ACTIVE 5YF ON CROSSOVER,80114 TAWS SHALL EE TESTED AT THE SAME TIFF. ANY LEAKS ALL COVERS,GASKETS AND SEALS ARE TO BE IN PLACE <br /> THE CONTRACTTIONOR <br /> OF CONTRACTOR AND PENTHAN FI DIRECTLY 70 THE MONITOR FrMNG OR ALLOW THE MANIFOLD VALVE TO BE OPEN INDICATED BY 50AP BUBBLES SHALL BE ELIMINATED BY TIGHTENING OR REGEMElTIN6, PIPING ELAS MUST BE STRAIGHT AND PROPERLY P.EMED. USE A AND �� TIGHT <br /> THE CONTRACTOR SHALL HAVE NOT LE55 THAN FIVE YEARS CONNTINUOUS DURING STEP I. INCLUDING TH05E AT TANK OKNIN65. MINIMUM OF b'PFA GRAVE. <br /> EXPERIENCE IN THE INSTALLATION FOR FUEL STORAGE AND STB 4, MONITOR THE PRESSURE ON BOTH THE INNER AND OUTER TANK FOR AT Q <br /> ONLY <br /> B Y H SYSTEMS. INSTALLATION IM EQUIPMENT SHALL CONTINUOUS PERFORMED LEAST 30 MINUTES NTH THE MANIFOLD VALVE CLOSED. 50AP THE OUTER TANK NOTELET OF FROM ANO BSFL4710NI ALL TESTS RITY. :MALL.BE MADE IN THE PRESENCE OF THE HEAL$BACKFILL TO BED FIFE. USE OP PIPE SPALERS <br /> ONLY IE WORKMAN LINGH40 HAVE A MINIMUM OF TNN YEARSVEATTENAND CHECK FOR BUBBLES. IF A LEAK 15 FOUND IN THE OUTER TANK GALL THE MANUFACTURER I `EAST 24 FROM THE CE OF ANY E AUTHORITY. CONTRACTOR MUST SNE AT HILL INCNURE STRAIGHT PIPING EUS, <br /> EXPERIENCE INSTALLING THIS TYPE EQUIPMENT AND WO HAVE ATTENDED p LEAST 14 HOURS NOTICE OF ANY TEST. Z F' <br /> TRAINING SEMINAR RIFT ON BY THE TANK MANUFACMRER, FOR REPAIR <br /> STB 5, NTH THE MANIFOLD VALVE STILL CLOSED,RELEASE THE PRE'f.A,RE AND GASOLINE PIPING TEST AFTER PAVING BASE INSTALLATION GASOLINE PIPING MAY NOT BE IN THE SAMA TRENCH NTH ELECTRICAL <br /> 6OVH0ONS STANDARDS, VENT THE INNER TANK (WILE MAINTAINING PRESSURE ON THE OUTER PRODUCT PIPING %ALL BE TESTED AGAIN AFTER GRADING AND ROLLING OF STONE BA-5E FOR CONDUIT5' <br /> EOUIPMEM AND INSTALLATION NECESSARY TO AGCOFPLISH THE WORK SPECIFIED STEP (1, MONITOR THE PRESSURE ON THE OUTER TAN, FOR 30 TO 60 MINUTES. PAVING HAS BEEN COMPLETED. THE TEST SHALL BE CONDUCTED FOR A MINIKH OF 30 MINUTES, <br /> HEREIN 5HALL COMPLY NTH THE LATEST REVISIONS OF THE APPLICABLE IF A LEAK 15 INDICATED CALL THE MANLFAGTVRER. DO NOT EXCEED 5 PSI DURING IF ANY LEAKING 15 DETECTED,CORRECTIONS SNA LL ON ONE SIDE OF THE DISPENSER CONTAINENT SUP AND ■ . ■ <br /> FEND <br /> FEDERAL,STATE,AND LOCAL GORES AREGULATIONS CONCERNING THE TESTS. IMMEDIATELY BE MADE AND THE ENTIRE TEST CONDUCTED AGAIN. ELECTRICAL CODUIT5 ENTER ON THE OPPOSITE SIDE. W 0 <br /> UNDERGROUND FUEL STORAGE TRENCHES MST BE KEPT CLEAN AND FRE OF DEBRIS AT ALL <br /> AND DISPENSING SYSTEMS INCLUDING BUT NOT LIMITED TO THE BLEFOLLOHN6, **NOTE OVERBURDEN CALCULATIONS SHALL BE PROVIDED FOR TEST ANUSES SHALL T PROVEN CAIBRATIOH GAUGES SH4ALL HAVE A MINIMUM 3' FACE AND _ TIMES 6 1/2'MNIRH CLEARANCE BETYEEN PIPING, <br /> ARTICLE 12NATIONAL FIRE PROTECTION ASSOCIATION, FLANMABL E AID THE RANGE SHALL NOT FXCBD 100 PSI, �V�A/■ <br /> COMBUSTIBLE LIGNID5 CODE. MFPA 30) CAMP;PROMOTIVE AND FOR WET HCL <br /> OLE APPLICATIONS. TEST THE COMPLETED SYSTEM AT 45 PSI MINIMUM -50 PSI MAXIMUM 0-I/2 TIMES THE <br /> MARINE SERVICE STATION CODE CEPA 3OA)A6TM SPECIFICATION A_-/.^"`� NORMA.OPERATR6 PRES.:U W. TIGHTEN THE SET 5GREW ON THE CHECK VALVE BY-PA96 LL <br /> D4021-86, GLASS FIBER REINFORCED POLYESTER UNDERGROUND _ -°'��•.�...•'_-^-. -r <br /> __._, /r`"-- -. ON THE NINr IN THE MERbE GY PUMPING AMTS)OR THE <br /> R15M,AND APPY AIR THROUGH A 3'SECONDARY PIPE INSERTION INTO THE SECONDARY ■ <br /> PETROLEUM STORAGE TAWS.PROUNIFTECTED <br /> FIRE CODE -STADA EL STORAGE <br /> THE CHEERS H THE ESSARY PRS AR'VALVE N AIR RISHR AT THE OR <br /> 5EL90R IF USED, CONTAINMENT FITTING 15 REOUIRID, j <br /> TESTING REQUIREMENT'S FOR PROTECTED MOTOR VEHICLE RUE. STORAGE TO ACHIEVE THEE USED, <br /> NIT PRESSURE,EITHER D AIR ERECOMPRESSORPRODUCT <br /> T A CYLINDER OF Q <br /> MAKS t 2085 -UR INSUI TEES LABORATORIES, INC.OUTLINE OF NTRO6IN MAY BE USED. HI7ROGE1 MUST BE USED IF THERE 15 PRODUCT IN THE TANKS OR LINES. HEAT OWNS OF THE SECONDARY CONTAINMENT PIPING <br /> FLAMMABLEINVESTIGATION FOR M UAPED AHOVE6R CALIF TAWS FOR BEDDING MATERIAL AN BACCH AN NNO MORE ROMDED STOLE,GLEAN AND FREE F 15 NOT REQUIRED <br /> FLAMMABLE AND COMBUSTIBLE LIQUIDS, CALIFORNIA AIR IN ST CE LONN6,NOT ESS THAN ER INCH AND NO MORE THAN 3/4 INCL DIAMIBTE (PEA EE FLO Nm AFTER PROPER PRESSURE HAS BEEN IN.ECTED INTO THE SYSTEM, THE PRE5` E SOURCE= <br /> BOARD (GARB) STANDARDS FOR INSULATED TAILS USED IN STAGE II 15 THE PREFERREDASTM MATERIA_. AS AN ALTERNATE,WASHED SOUNDNESS, <br /> STOW,, T FRE PONN6 (COMPRESSOR OR A MINIMAL OF 2 1/2'CLEAR DISTANCE BUT EEN <br /> VAPOR RECOVERY SYSTEMS.AWIC TONERS LABORATORIES, INC., AND MEETING ASTM C-33 SS THAN <br /> 1/8 4.1 FOR CIV RE AND /2 INC IN NTH ANGULAR NITROGEN) SHALL.BE PHYSICALLY DISCON EGTED OWN&THE TEST PERIOD. PRESSURE OF MORE SECONDARY CONTAINMENT FITTINGS K15T BE MAINTAINED <br /> STORA&LASSGE <br /> OF II OLBURIO PLASTIC TAWS FOR THE LCOWLOAD PARTICLE SIZE OF NOT LESS THAN SE INCH OR MORE THAN AI RCN IN DIAMETER MAY THAN 50 PSI HILL DAMAGE THE VALVE SEAT AND DISC IN THE SUBMERGED PUMP, AT PIPING OW55OVHRS, D LLMIXTU _ <br /> STORAGE UN PE ARITE M PRODUCTS,ALCOHOL AND ALCOHOL-GASOLINE N MANUFACTURER <br /> SUBSTITUTED. R FINER OF END MATERIALS 15 NOT AVAILABLE,CONTACT THE O <br /> LABORATORIES, <br /> UDERNRITERS MPRIOR AMR O FOR HIS E OMERENDATIO B IN SUBSTITUTIONSDOTA ARE ALLONED No 13E A MINIMUM OF 1/2'EXP05W SECONDARY CONTAINMENT PIPE <br /> LABORATORIES, INC,NONMETALLIC, END BLENDS,ALC040 PIPING FOR PET ENOL PRIOR APPROVAL OF TAE OWER+FIELD EGUNLD AT NOT ALLOW BACKFILL 70 E MIXED MUST BE MAINTAINED BETHEEN 5ECONDARY FITTIN65 AT 0 <br /> PRODUCTS, L, ANDEREALCOHOL EDFUEL IFILE L5 SUCH A5 METHANOL WITH OTHER MATERIAL AT 7}E SITE. DURING GOLD NFATkfR BACKFILL MUST BE DRY AND 6ASOLLNE DISPBSERS, DISPENSERS WILL BE FURNISHED TO THE JOB SITE BY OWER PIPING CROSSOVERS. <br /> AND ETHANOL., AND REFORMULATED FiPr35(FLIP MWI62). FRE OF ICE OCE WOIAD BE A *FALSE, BACKFILL MICH WOAD LATER COLLAPSE), FOR INSTALLATION AND CONNECTION BY CONTRACTOR SECURE TO ISLAND NTH ANCHOR BOLTS <br /> NATIONAL ELECTRIC CODE IONOTE SEE MFG. INSTRUCTIONS FOR BACKFILLING INSTRUCTIONS. OR A MINIMUM OF TWO RID MEAD J B, ANCHORS(RED HEAD AS MANUFACTURED BY 177 <br /> OEC),ARTICLE 513. ALL WORK SPECIFIED HEREIN SHALL CONFORM TO P41LLIP5 DDIL DIVISOR MCHI6AN CITY, IT$UTANIA. AREA ODER DISPENSERS IN 15lAND IS <br /> RE EXCEED TIEDSTANDARDS, <br /> REQUIREMENTS,OF THE ABOVE T MENEVMI!NCED CODES, TO BE FILLED NTH GLEAN SAND TO BOTTOM OF SEAR VALVE,EXCEPT WERE DIWeLgR _ <br /> REGULATIONS AND D PUELI RDSr PROVIDED.THAT ICT M114 T THE CONTAIN-FNT BOXES ARE REQUIRED. <br /> PROVi510N5 OF SAID PBLICATIONS ARE IN CONFLICT NTH THE <br /> REQUIREMENTS SPECIFIED HEREIN DISFESER CONTANPINi SUMP <br /> THE STRINGENT REQUIREENT SHALL APPLY DX VATOW IN 600P SOIL THE HOLE MUST BE LARGE ENOUGH TO PROVIDE 12 )WAE.5 BELOW TE5TIN&OP LEAK DETOGTORS'MTER SYSTEM HAS BEEN PURGED OF AIR BY REPEATED PRODUCT AND VAPOR IMPACT VALVES MT BE COVERED ■ . ■ O <br /> BOTTOM OF TANKS NTH THE TOP OF TAE TANK 4 FEET BELOW FINISH GRADE,2 FEET 13ETYEEN OPERATION THE CONTRACTOR 15 TO TEST THE OPERATION OF ALL LEAK DETECTORS, THE TEST 15 TO BE OR PUGGED AT ALL TINES DURING CONSTRUCTION <br /> DIVISION 16 - EPCTRLCAL, TANKS AND 2 FEET BETI EEN THE TANK AND THE SIDE OF HOLE MIEN EXTREMELY POOR SOILS, AS RECOMMENDED BY LOCAL WILDINWFIRE AND MFG.RECOMENDATIONS. W <br /> OR SOILS MIC44 BECOME FREE FLONN6 WEN SATURATED (QUICKSAND) ARE ENCq/N7ERED, EACH PRODUCT AND ITS DETECTOR 15 TO BE TESTED SEPARATELY BY CREATING NOTE MAINTAIN UNIFORM CLINE OF TIE FLEX CONEOTOR Q <br /> H. ALL HORK STALL CONFORM TO THE NATIONAL ELECTRIC CODE, THE DIMENSION EATYM THE TANK AND THE 51DE OF THE HOLE MIST BE INCREASED TO 4 FEET. A 'FALSE LEAK', THE PUS IN THE 5AEAR VALVE 15 REPLACED BY A PETCOCK WHILE THE FLEX CONNECTCR5 MUST BE INSTALLED NTHOUT KINKS AD <br /> 1944 EDITION AND TO THE APPLICABLE REQUIREMENTS IT MAY A50 BE NECESSARY TO LINE THE HOLE WITH A BLANKET OF FILTER 5AR-ER6ED FU4P 15 RUNNING,THE 'LEAK' 5OULD ACTIVATE THE DETECTOR AND THE FLOW ARE LOT PERMITTED TO TOUCH TIE WALLS OF TIE DISPENSERS O , <br /> OF LOCAL,STATE,AND FEDERAL COPE(S) AND/OR AGENCIES FABRIC SCH A5 OUPONT 'TYPAR'. WENN SUCH A CONDITION IS SUSPECTED,GALL UPON THE REDUCED TO A TRICKLE. IF THIS DOES NOT HAPPEN THE LEAK DETECTOR 15 TO BE REPLACED AND CONTAINMENT BOX OR H.ELTIRCAL CONDUITS. Y <br /> HAVING JURISDICTION,AND SHALL TAKE PRECEDENCE OVER WORK MANUFACTURERS REPRESENTATIVE AND OHER5 FIELD EL61NEER BEFORE PROCEEDING. THE TEST REPEATED UNTIL IT DOES. IF AN ELECTRONIC MONITORR6 SYSTEM 15 INSTALLED,THE Z <br /> SHONE. ANY DISCREPANCIES 5HALL E BROUGHT TO THE ATTENTION CONTRACTOR MUST REVIEW OWEE5 SOILS REPORT FOR SOILS CLASSIFICATION CONTRACTOR LEAK DETECTOR 15 TO BE TESTED AS PART OF THE TEST OF THAT SYSTEM. 015PDUR CONTAHMENT 50415 M5T BE KEPT CLEAN AND <br /> OF THE DE516NER PRIOR TO THE INSTALLATION OF WORK WILL BE RESPONSIBLE FOR MAKING CERTAIN THAT THE EXCAVATION AREA 15 ADEQUATELY PROTECTED TO FREE OF DEBRIS A7 ALL TIMES. <br /> 2. M-ECTRICAL CONTRACTOR 5HALL VERIFY DIAGRAMMATIC LAYOUT OF PREVENT ALL SURFACE WATER FROM ENTERING THE EXCAVATION AND WILL BALLAST TANKS TO PREVENT PEL'ENDIOAAR PE ETRATIO 5 OF CONTAINMENT SUMP O <br /> ELECTRICAL WORK NTH DES16N M PRIOR TO INSTALLATION FLOATING IF CONDITIONS WARRANT. HALLS ARE PREFERRED- <br /> 3. EXPLOSION PROOF JACTION BOWS SHALL BE ALCESCIBLE FROM THE MANHOLE HITNN maw'AM BK#INK <br /> LL. PLACE THE TAS ON AT LEAST 12 INCHES OF APPROVED BEDDING 20 DEGREES 15 THE MAXIMI M ALLOWABLE PENETRATION J <br /> 24'OF FINISHED GRADE MATERIAL. DO NOT PAGE ON SCREEDS,TIMBER CRADLES OR THE (LIKE. LEVE. THE TAW IN BOTH ANGLE. <br /> DIRECTIONS,NTH THE SUBMERGED PUMP END APPROXIMATELY 2 INCHES ABOVE THE OTHER r <br /> ELECTRICAL -LAYOUT t CONDUIT RUNS ED. 5TAR7 PLAGUG THE BACKPILL AND MANUALLY FOROE THE FIRST TWO FEET OF MIATERIAL UNDER ALL 5,.4P PENETRATIONS SHALL BE WATER TIGHT. SEAL THE <br /> THE TANK ALL AROUND BOTH SIDES AND ENDS TO PROVIDE UNIFORM 9IUFPOR7,USING A SHORT OUTSIDE OF EVERY PENETRATION BOOT. I_ <br /> NOTE"'CONTRACTOR TO REVIEN OF STE SPECIFIC CONDITIONS,LAYOUT 2 X 4 OR APPROPRIATE BLUNT TOOL. COMPLETE BACKFILL TO THE TOP OF THE TANK,PACING LABS.THE PRODUCTS AT THE DISPENSER CONTAINMENT BOX. � U/7 <br /> PIPING AND ELECTRICAL TO MAINTAIN SEPARATE THE MATERIAL UNIFORMLY AROUND IT AS IT(THE MATERIA) DSES IN TUE EXCAVATION <br /> TRENCHES AND TO ELIMINATE OR MINIMIZE PIPING AD ELECTRICAL GR.OSSOVER5, PACE 13ARPJCAPES AND EARTH AROUND THE EXCAVATION TO PREVENT ACCIDENTS AND TO <br /> PREVENT SURFACE RUN-OFF FROM ENTERING THE EXCAVATION. <br /> I. ELECTRICAL CONDUITS SHOULD PENETRATE TIE DISPENSER CONTAINMENT SUP PIPING ATO TE5THN6 MAKE PIPING CONEGTIONS TO TAW(COMPLETE IF POSSIBLE, <br /> FROM THE SIDE OPPOSITE FROM 71EPETRLOLUH PIPING. DO NOT 5TAGK CONDUITS. OR FLW OTHER OPENINGS IF PIPING CANDT BE COMPLETED) IN ACCORDANCE NTH THE TRENCH NTH PETROLEUM DRAWINGS & SPECIFICATIONS <br /> 2. ELECTRICAL CONDUIT <br /> .REMAIN THE PROPERTY OF <br /> PIPIN6EECTRCAL CONDUIT, DRANNGS. TEST THE TAW,VAPOR RECOVERY,AND VENT LUES UNDER 5 PSI,SOAPING ELATE N <br /> $NOTA.NOT E LOCATED IN THE SANE ALL JOINTS, INC LUDIN6 THOSE AROUD FITTINGS IN TME TAW.(TEST WITH NITROGEN,NOT <br /> 3. TRENOE5 AND CONDUIT RUMS SHAJ-I_BE IJAD OUT NEATLY. AIR IF THE TANK CONTAINS ANY PRODUCT). COPIES OF THE DRAWINGS <br /> k SPECIFICATIONS RETAINED <br /> BE USED IN THE TAHOLE-NEAP ALL RMC CONDUIT TO PROTECT FROM CORROSION. BACKFILL AND SLAB AT GRADE, REICONCRETE SNILE BACKFILL OVER TAM, NTH THE SAE MATERIAL BY THE CLIENT MAY BE <br /> 4. ALL RIGID METAL CONDUIT,02 PLASTIC COATED RMC SHAM UTILIZED ONLY FOR HIS USE <br /> 5. <br /> 5U36RADE. INSTALL A b INCH REINFORCED COLAB AT GRADE,PER DRANN65. <br /> 5. CONDUIT SHALL BE 241'MINIMUM BELOW FINISH GRADE W 6'NDE YELLOW PAVING AND GIF.ANNO.PRECAUTIONS TO KEEP SURFACE HATTER FROM ETTERN6 THE FRESH AND FOR OCCUPYING THE <br /> MARKING TME ALONG TRENCH AT 12'BELOW FINISH GRADE BACKFILL SNOOD BE MAINTAINED UNTIL JUST BEFORE PAYING OR FINAL GRADING. PROJECT FOR WHICH THEY <br /> PAVING AND PATC41N6 ASPHALT 5H4ALL BE 6' THICK W 6'RASE TO AIRPORT SPECS. <br /> WERE PREPARED, AND NOT <br /> E.GC7RIGTL-PAN13-9 < 6TIlIPlSfT <br /> FOR THE CONSTRUCTIONOF <br /> ANY OTHER PROJECT, <br /> PANELS AID EQUIPMIENIT ARE TO BE MOUNTED FOR ACCESSIBILITY AND FOR AN ORGANIZED <br /> TERMINATION OF CONDUIT RUNS. ELECTRICIAN SHALL KNOW AND FOLLOW ALL N.E.G.,AND <br /> LOCAL CODE RE-OIR ME NTS. <br /> ALL HIRE PULP ARE TO BE CONTIWOJS. NO SPLICES ARE ALLOYED. <br /> ALL HIRF5 ARE TO BE LEGIBLY MARKED, Y[4 HOLE BSTALLAVON oATE: 11-10-97 <br /> LLAABELS RARE REWIRED AND ON ALL ARE PANELS,HIREIW5 ouDED ' "NOTE OVERBURDEN CALCULATIONS SHALL BE PROVIDED FOR SCAM Vr4 <br /> THE DESCRIPTION OF EACH BREAKER MST BE TYPED. FOR NET HOLE APPLICATION. <br /> ALL HIRES ARE TO BE ORGANIZED,AND NEATLY BUDLEDIN EACH GUTTER <br /> DRAWN: <br /> 115E GROUNDING TELLALL <br /> Al CONDUITS. <br /> ISOLATE DATA <br /> AND POKER TURES FROM ONE ANOTHER /�, <br /> JOB; I*S1 <br /> PVC,ELECTRICAL CONDUIT SW L BE 24' TNIMM MON <br /> GRADE.6'WIDE YELLOW MARKING TAPE ALONG <br /> TR84 -r✓ <br /> TRENCMAT 12'EiH.ON FINISH GRADE ' FllE NAME: <br /> SHEEN <br /> A -2 <br /> OF SHEETS <br />