Laserfiche WebLink
BOARD OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT sERVINa <br /> Jamas Cuib*naon, Pro. ' <br /> City of Lodi <br /> A trice• V•nnuccl. Secy. 1601 Eaat Hazelton Avanue, P. 0. Dox 2009 San Joaquin County <br /> A nlhonalllla Van Spronaen City of E•c•lon <br /> Eul Pimenlel Stockton, California 95201 City of Manteca <br /> fun Bupbee City of ftl <br /> Daniel L. Floras 209/466-6781 City of of Ripon <br /> on <br /> John 0. Most, M.O. City of Tracy <br /> William J. Wada Jogl Khanna. M.D., M.P.N., District Health 0111car San Joaquin County <br /> Mary Anna Lova San Joaquin County <br /> J <br /> Facility Name < ` qvL, <br /> Address X23 d t dTfv� <br /> Date of Inspection Inspector <br /> MONITORING ALTERNATIVE N7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> __VAnnual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours) . <br /> (For example: level treasured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> If liquid level varies more than 1% of the tank volume or 5 gallons , which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours , as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> 0 Precision test(s) must be performed by and results submitted to this <br /> office within 30 days of the test. <br /> V Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to thr specified <br /> date. <br /> 4/86 UGT 3 <br />