Laserfiche WebLink
• <br />• <br />0 <br />IMF UNIFIED PROGRAM CONSOLIDATED FORMWW <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1b <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.54b <br />�( <br />1. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify): <br />PANEL MANUFACTURER: a9ass <br />MODEL #: / 49636. <br />LEAK SENSOR MANUFACTURER 490's7 <br />1 MODEL p(S): 7,7v L 51 3 490.38 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Rka. YES ❑ b. NO 490." <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a. YES 4b. NO 490'60 <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES 2th. NO 490'61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a. YES fib. NO 4W62 <br />2. UDC CONSTRUCTION IS JQ L SINGLE -WALLED ❑ 2. DOUBLE -WALLED 493 <br />IF DOUBLE WALLED: 690b°' <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1. LIQUID Q 2. PRESSURE 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES ❑ b. NO 4966ab <br />VII. PERIODIC SYSTEM TESTING <br />I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4�5- <br />L DETECTION (ELDMUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />. SECONDILARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490'66 <br />3. SPL BUCIyTS ARE TESTED ANNUALLY. 4t <br />VIII. RECORDYEEPING <br />77 F following monitoring/ imensnce records are kept for this facility: <br />IR integrity <br />$Alarm logs 49ad9a Visual Inspection Records 4a6rb Tank testing resuRs 4966aC <br />testing results (and supporting documentation records). 4so.6sa RL Tank gauging results (and supporting documentation records). 49x6& <br />ELSIR <br />ATG Testing results (and supporting documentation records). 4a6ar ❑ Corrosion Protection 60 -day logs 4a6as <br />,Equipment maintenance and calibration records. 49060h <br />DL TRAINING <br />Personnel with UST monitoring responsibilities are familiar with all of the following documems relevant to theirjob duties. 49069a <br />RERRENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />$, THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Requited) 490 % li <br />PERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 49a69c <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 496694 <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 4o69e <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION"49049f <br />Q�. SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49 ss <br />❑ OTHER (Specify): M69k m6 <br />This facility has a "Designated UST Operator" who has passed the Califomia UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a rtum¢r consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />➢ The facility employee's role with regard to spills and ove�lls as specified in the UST Response Man <br />L Names of commct person(s) for emergencies and monitoring alarms. 4so.7o <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 4671 <br />XI. PERSONNEL RESPONSERILITIES <br />The UST Owner/Operamr is responsible for ensuring that: 1) the daily/mutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The toll person(s) are responsible for performing the monitoring and equipment maintenance <br />NAME Lei 4son TITLE zroes ggi 49691 <br />NAME 49a74 TITLE 49675 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner tut, and inform the owner/opemtor of any <br />conditions that need follow-up action. <br />XII. OWNEWOPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is trite and aceumte to the best ofmy Imowledge. <br />APPLICANT $ T[JRE 49at6 <br />614— <br />T <br />DATE: Q 496n <br />APPLICANT NAMF,-(print) /J 49679 <br />APPLICANT TITLE: /' 49La79 <br />Jy LiI/�7i v+Zr�eisT <br />'✓4J) /& Com: f%//-l�-G/GJi/�- <br />UPCF UST -D (122007) 314 <br />it <br />