My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7500
>
2300 - Underground Storage Tank Program
>
PR0231644
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:12:42 PM
Creation date
11/5/2018 5:20:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231644
PE
2381
FACILITY_ID
FA0003207
FACILITY_NAME
JEFFERSON ESD-JEFFERSON SCHOOL
STREET_NUMBER
7500
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25332018
CURRENT_STATUS
02
SITE_LOCATION
7500 LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINNE\7500\PR0231644\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rKum P 1 d <br /> BAC\�K-FU-L�EXCAVATION CERTIFICATE <br /> Project Location 3^'v i L-�N+J C� �U <br /> Owns Phone No. ?n-3,31t 331N <br /> Contractor N 1 Phone No. g��� License No. 6S)3kJ0 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> I. Submission of Soil Engineer's Compaction Repon within 30 days of project completion, or <br /> 2. Submission of verification, e.g-, load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> Zl B. Crushed rock—self-compacting material Dot «tore tban three-quarurs (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will trot be permitted for bacifiill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> venfication tbat the select material described above will be placed at a minimum of five (S) cubic yards per 1000 gallon tank <br /> displacemew and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> /N�atme nnt) <br /> • .,1` ��tG.1 W�L�It-N"`LJ l" i1' � l .�b� <br /> lIe L <br /> l NIC <br /> • Shall be the responsible managing empioyee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.