Laserfiche WebLink
.r ..w <br /> I. INTRODUCTION <br /> The purpose of this Site Safety Plan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the: <br /> REMOVAL OF UNDER GROUND STORAGE TANK and CONFIRMATION <br /> SOIL SAMPLING at JEFFERSON SCHOOL in TRACY, CALIFORNIA. <br /> This plan describes hazard information and health and safety procedures to be followed <br /> by all designated field personnel during the field activities & sample collection <br /> operations. <br /> H. FACILITY BACKGROUND/WORKPLAN <br /> A. Address <br /> 7500 WEST LINNE ROAD TRACY, CALIF. <br /> B. Location <br /> The site is on the south east comer of Christman Road & Linne Road in Tracy, <br /> Calif., due south of the main township of Tracy. <br /> C. Schedule <br /> Completion of an excavation in and around (1) 500 Gallon Gasoline U.S.T.. <br /> When the tank is located and exposed it will be triple rinsed, pumped of the <br /> rinsate with a vacuum truck, inerted using dry ice (CO2), removal & loading for <br /> transportation, soil sampling and backfilling of excavation. All activities to be <br /> conducted during daylight hours (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of a Case 580K backhoe,jackhammer, compressor, <br /> steam cleaner, air pumps, soil sampling tools, compaction equipment. <br /> Detailed or Specific specialty equipment is used as needed for site specific <br /> conditions and are unknown at this time. <br /> III. KEY PERSONNEL AND RESPONSIBILITIES <br /> All of the field and excavation activities will be performed by Don Light of Del-Tech <br /> Geotechnical Support. The soil sampling will be completed by Mike Niemi of <br /> Geological Technics, Inc. Soil samples collected will be forwarded to Sherwood Labs. in <br /> Hilmar, Ca. under Chain-of-Custody. <br />