My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7500
>
2300 - Underground Storage Tank Program
>
PR0231644
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:12:42 PM
Creation date
11/5/2018 5:20:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231644
PE
2381
FACILITY_ID
FA0003207
FACILITY_NAME
JEFFERSON ESD-JEFFERSON SCHOOL
STREET_NUMBER
7500
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25332018
CURRENT_STATUS
02
SITE_LOCATION
7500 LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINNE\7500\PR0231644\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.r ..w <br /> I. INTRODUCTION <br /> The purpose of this Site Safety Plan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the: <br /> REMOVAL OF UNDER GROUND STORAGE TANK and CONFIRMATION <br /> SOIL SAMPLING at JEFFERSON SCHOOL in TRACY, CALIFORNIA. <br /> This plan describes hazard information and health and safety procedures to be followed <br /> by all designated field personnel during the field activities & sample collection <br /> operations. <br /> H. FACILITY BACKGROUND/WORKPLAN <br /> A. Address <br /> 7500 WEST LINNE ROAD TRACY, CALIF. <br /> B. Location <br /> The site is on the south east comer of Christman Road & Linne Road in Tracy, <br /> Calif., due south of the main township of Tracy. <br /> C. Schedule <br /> Completion of an excavation in and around (1) 500 Gallon Gasoline U.S.T.. <br /> When the tank is located and exposed it will be triple rinsed, pumped of the <br /> rinsate with a vacuum truck, inerted using dry ice (CO2), removal & loading for <br /> transportation, soil sampling and backfilling of excavation. All activities to be <br /> conducted during daylight hours (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of a Case 580K backhoe,jackhammer, compressor, <br /> steam cleaner, air pumps, soil sampling tools, compaction equipment. <br /> Detailed or Specific specialty equipment is used as needed for site specific <br /> conditions and are unknown at this time. <br /> III. KEY PERSONNEL AND RESPONSIBILITIES <br /> All of the field and excavation activities will be performed by Don Light of Del-Tech <br /> Geotechnical Support. The soil sampling will be completed by Mike Niemi of <br /> Geological Technics, Inc. Soil samples collected will be forwarded to Sherwood Labs. in <br /> Hilmar, Ca. under Chain-of-Custody. <br />
The URL can be used to link to this page
Your browser does not support the video tag.