My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7500
>
2300 - Underground Storage Tank Program
>
PR0231644
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:12:42 PM
Creation date
11/5/2018 5:20:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231644
PE
2381
FACILITY_ID
FA0003207
FACILITY_NAME
JEFFERSON ESD-JEFFERSON SCHOOL
STREET_NUMBER
7500
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25332018
CURRENT_STATUS
02
SITE_LOCATION
7500 LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINNE\7500\PR0231644\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. *M0 <br /> B. Medical <br /> All contractor and subcontractor field personnel assigned to this operation will <br /> have completed a comprehensive medical examination within the last 12 months. <br /> C. held Supervision <br /> All field activities will be supervised by a Field Supervisor having training and <br /> experience commensurate with the activity. Field Supervisors have the authority <br /> and responsibility to correct any unsafe act or condition during the course of <br /> operations. <br /> D. Safe Work Practices <br /> All contractor and subcontract personnel assigned to the operation will follow <br /> safe work practices including good personal hygiene, reporting all injuries, <br /> following instructions, inspecting equipment before use, anticipating hazards, <br /> utilizing the buddy system, etc. <br /> E. Job Safety Review <br /> Field Supervisors will conduct daily pre-operations safety meetings with all <br /> contractors and subcontractor personnel. <br /> VII. SPECIFIC HEALTH AND SAFETY REQUIREMENTS <br /> A. Site Control <br /> Work zones and other site control measures will be established as needed for the <br /> operation, depending on chemical hazards, work location and other requirements. <br /> B. Decontamination <br /> When personal protective clothing and equipment (Le., respirators) are required <br /> for use, standard decontamination procedures shall be followed. <br /> 1. Reconunended Procedure <br /> (a) Move to designated area (decontamination station). <br /> (b) Wash boots, gloves and suit, as needed. <br /> (c) Remove tape. <br /> (d) Remove disposable suit (from the inside, out) <br /> (e) Remove boots. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.