My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7500
>
2300 - Underground Storage Tank Program
>
PR0231644
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:12:42 PM
Creation date
11/5/2018 5:20:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231644
PE
2381
FACILITY_ID
FA0003207
FACILITY_NAME
JEFFERSON ESD-JEFFERSON SCHOOL
STREET_NUMBER
7500
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25332018
CURRENT_STATUS
02
SITE_LOCATION
7500 LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINNE\7500\PR0231644\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These items are the minimum required for all personnel working at the site <br /> in work zones or areas which do not present any potential chemical <br /> exposure hazard. <br /> (a) Hard hat. <br /> (b) Work clothes (coveralls or work uniform). <br /> (c) Safety glasses or goggles. <br /> (d) Hearing protection required if noise levels exceed 90 dBA, eight <br /> (8) hour average at driller operation (or 85 dBA for workers who <br /> have not received a baseline audiogram or have a permanent <br /> threshold shift). <br /> D. Safety <br /> The following safe work practices shall be followed for all construction activities: <br /> ♦ 1. Underground and overhead utilities shall be identified and located prior to construction. <br /> ♦ 2. Only authorized personnel shall be allowed in the work area. <br /> ♦ 3. Any drilling or excavation areas shall be clearly marked. <br /> ♦ 4. All soil staging areas shall be marked, as needed. <br /> ♦ 5. Vehicle traffic shall not be allowed in equipment operating areas. <br /> ♦ 6. Unauthorized foot traffic shall not be allowed into the construction area. <br /> E. Emergency Procedures <br /> All field personnel shall comply with the following emergency procedures: <br /> 1. Safety standby equipment (include a first aid kit, fire extinguisher and a <br /> portable eye wash) shall be set up at the job site prior to the beginning of <br /> work. <br /> 2. All incidents shall be reported to the Field Supervisor immediately. <br /> 3. The Field Supervisor shall report incidents to the DEL TECH Project <br /> Manager. <br /> 4. Emergency response support including fire department and/or paramedic <br /> ambulance shall be requested as needed. (See Table 1.) <br /> 5. Emergency telephone numbers shall be indicated on Table 1. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.