Laserfiche WebLink
0 0 <br /> aOARO OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> James Culbertson, Pre.. SERVING <br /> Patricia E. vannucc(, sec'y. City of Lod( <br /> Anthonelt• Van spronsen 1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br /> Earl Plmentel Stockton, City of EaCalon <br /> Fun 8u9ba* CaliforniaCeilf Ornla 95201 City of Manteca <br /> Oanlel L. Flores 209/466-6781 City of Ripon <br /> John 0. Magi, M.O. City of Stockton <br /> William J. Wade Jopl Khanna, M.O., M.P.H., olalr(ct Health Officer City of Tracy <br /> Mary Anna Love San Joaquin County <br /> San Joaquin County <br /> Facility Name <br /> Address 2- 6L� ZocAe �t� <br /> Date of Inspection / _ InspectorL� <br /> MONITORING ALTERNATIVE N7 S`099j GUd4h- <br /> Limited to underground storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> IAnnual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> L-�Xif liquid level varies more than 1% of the tank volume or 5 gallons , which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours , as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> L'/ Precision test(s) must be performed by3j/J1' 7 and results submitted to this <br /> office within 30 days of the test. 7-"J <br /> Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />