My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
0
>
2300 - Underground Storage Tank Program
>
PR0541130
>
REMOVAL REMOVAL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2019 10:49:29 AM
Creation date
11/5/2018 5:44:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1989
RECORD_ID
PR0541130
PE
2361
FACILITY_ID
FA0023551
FACILITY_NAME
CITY OF LODI
STREET_NUMBER
0
STREET_NAME
LOCUST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
LOCUST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LOCUST\0\PR0541130\REMOVAL 1989 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s • <br /> SAN JOAQUIN LOC.zar . 1-IfiAr.T;-; DISTRICT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion reguired for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the tank's <br /> invert [tank's bottom] at a collection depth not be exceed 2 - 9 feet. If contamination <br /> is documented during closure, an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> rLessothan <br /> ANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> 1000 gallons ONE per tank Fill or pump end of tank <br /> 0,000 gallons TWO per tank One at each end of tank <br /> allons and up THREE OR MORE Ends and Middle or <br /> per tankgenerall spaced along <br /> the length of the tank <br /> Piping ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> LO�.RL <br /> NK SIZE MINIMUM N0. OF LOCATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES _SAMPLES OF WATER SAMPLES <br /> 00 <br /> ES3GALLON3 - From wall next togle Tank) TWO tank ends at soil/ <br /> yrourn9water ppiE <br /> interface <br /> TER THAN From wall next to ONE <br /> 10,000 GALLONS tank ends at soil/ <br /> OR groundwater <br /> TANK CLUSTER FOUR interface <br /> OTHFfR SPECIAL CONDITIONS <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> obrutintilwblowpinoato <br /> temosssjcal removal of thestcowlthenalsamlgccordncollect heabovconditin <br /> TANK SIZE T MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tank enerally spaced along <br /> the length of the tank <br /> EH 23 097 12/88 -----__-- -- <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.