My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:07:04 PM
Creation date
11/5/2018 5:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\2500\PR0231356\BILLING 1985-1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STATE OF CALIFORNIA • �'� <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B .r , <br />1 1 ' <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION El7 PERMANENTLY CLOS ON SIT[ <br />ONE REM F-1 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED / <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 2*✓ Al' A011 - <br />TA IV <br />✓r <br />TAUV MtQP010Tnld. __..-..__.. _..._ _. ___ coFCIFYIFIINKNOWN <br />A OWNER'S TANK I D N 2 B. MANUFACTURED BY: <br />C DATE INSTALLED (MO/MAYNEAR) /,97 % / D. TANK CAPACITY IN GALLONS: Q, 4)(Z <br />II TAUV P/1MTCMTC IC A 1 is IAAM Cn rnM01 FTF ITEM C. <br />1 MOTOR VEHICLE FUEL ❑ d OIL B. � <br />C. 1A REGULAR UNLEADED ❑ 3 DIESEL ❑ 8 AVIATION GAS <br />A ❑ 2 PETROLEUM ❑ BO EMPTY Lam! PRODUCT 1G PREMIUM UNLEADED ❑ E]4 GASAHOL ❑ 7 METHANOL <br />❑ tG MIDGflADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br />❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN [-]2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OFSUBSTANCE STORED C. A. S. M: <br />III TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.3, AND C, AND ALL THAT APPLIES IN BOX D ANDS <br />❑T 1 DOUBLE WALL <br />- __ <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 5 INTERNAL BUDDER SYSTEM ❑ 95 UNKNOWN <br />A. TYPE OF <br />SYSTEM <br />I� 2 SINGLE WALL <br />F74 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />A U <br />t!J`t BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 6 100% METHANOL COMPATIBLE W/FRP <br />(Prlmery Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />LINING OR <br />❑ 5 GLASS LINING <br />6 UNLINED <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE WITH 1001A METHANOL? <br />YES_ NO— <br />D. EXTERIOR <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />CORROSIONF�95 <br />❑ 5 CATHODIC PROTECTION ❑ 91 NONE <br />L,LJ UNKNOWN <br />❑ 99 OTHER <br />PROTECTION <br />SPILL CONTAINMENT <br />E SPILL AND OVERFILL, BIC. <br />INSTALLED (YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br />O_ <br />NO_ STRIKER PLATE VES_ NO_ DISPENSER CONTAINMENT YES_ NO- <br />DROPTUBE YES_ <br />....__ II -...mem—noun nnTM l[ ARM ICARIF <br />I TAUV I CAV nCTCPTIPM <br />r. rnnrx I_-%— <br />ANNUAL <br />F-1 1 VISUAL CHECK 2 MANUAL INVENTORY ❑ 3 ❑ 4 GAUGING AUTOMATIC TANK ❑ 5 GROUND MONITORINGTER ❑ 6 TESTING RECONCILIATION MONITORING <br />MONITORING <br />❑ 7 <br />MONITORING INTERSTITIAL 8 SIR ❑ 9 WANK GAUGINGAL ❑. MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN -PUCE) <br />1. ESTIMATED DATE LAST USED (MO/DAVA'R) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES E:] NO E]SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />THI,"Alrl= PPAIAI ry rIF PFR II IRY AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />DATE <br />TANK OWNER'S NAME <br />(PRINTED 4 SIGNANRE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # �FACILITY # �-�--� TA�NK--#-� <br />STATE I.D.# � = I I I L_L_JTTE-J <br />PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION- FORM A. UNLESS A DUHKLN I tUKMA HAa eern IILCV. r..n,..�...,,.,..,......... ...-....... •..-••.-_.-..-.-. __-- <br />SHOULD BE ACCOMPANIED BY A PLOT PLOE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE IfGROUND STORAGE TANK REGULATIONS <br />FOfl0G3/&AI <br />FORM B (6.95) <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />Uj 2 PRESSURE A U <br />3 GRAVITY A U <br />4 FLEXIBLEPIPING A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A <br />1 SINGLE WALL <br />A U 2DOUBLE WALL A U <br />3 LINED TRENCH A U <br />95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U 2 STAINLESS STEEL A U <br />A U 6 CONCRETE A U <br />A U 10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />7 STTESELL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br />P4 95 UNKNOWN A U 99 OTHER <br />D. <br />LEAK DETECTION <br />❑ <br />1 MEC1+011 l UNE LEAK <br />M7EMOR ❑ <br />2 UNE TGWNDM 3 CONTNIIWS RRERSTIINL ❑ 4 ELECTRONIC LINE ❑ <br />TESTING ❑ MGMTmNG LEAK DETECTOR <br />5 AUfONATIC PUMP ❑ 99 OTHER <br />EHUTOOWN <br />I TAUV I CAV nCTCPTIPM <br />r. rnnrx I_-%— <br />ANNUAL <br />F-1 1 VISUAL CHECK 2 MANUAL INVENTORY ❑ 3 ❑ 4 GAUGING AUTOMATIC TANK ❑ 5 GROUND MONITORINGTER ❑ 6 TESTING RECONCILIATION MONITORING <br />MONITORING <br />❑ 7 <br />MONITORING INTERSTITIAL 8 SIR ❑ 9 WANK GAUGINGAL ❑. MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN -PUCE) <br />1. ESTIMATED DATE LAST USED (MO/DAVA'R) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES E:] NO E]SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />THI,"Alrl= PPAIAI ry rIF PFR II IRY AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />DATE <br />TANK OWNER'S NAME <br />(PRINTED 4 SIGNANRE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # �FACILITY # �-�--� TA�NK--#-� <br />STATE I.D.# � = I I I L_L_JTTE-J <br />PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION- FORM A. UNLESS A DUHKLN I tUKMA HAa eern IILCV. r..n,..�...,,.,..,......... ...-....... •..-••.-_.-..-.-. __-- <br />SHOULD BE ACCOMPANIED BY A PLOT PLOE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE IfGROUND STORAGE TANK REGULATIONS <br />FOfl0G3/&AI <br />FORM B (6.95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.