Laserfiche WebLink
JYJJwf SS <br />STATE OFCALIFORMA � �' <br />STATE WATER RESOURCES CONTROL BOARD i P'' aL-yi� .' <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B o ��,�.c. <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br />MARK ONLY ❑ 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT <br />❑ <br />5 CHANGE OF INFORMATION <br />j❑ <br />7 PERMANENTLY CLOSED ONSITE <br />ONE REM ❑ 2 INTERIM PERMIT '❑ <br />4 AMENDED PERMIT <br />❑ <br />6 TEMPORARY TANK CLOSURE <br />❑ <br />a TANK REMOVED <br />((.J �� <br />DBAOR FACILITY NAME WHERE TANK IS INSTALLED: <br />y579b ey, <br />L -LT <br />/ /9 <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK L0.s /!.�{ <br />I R- MANUFACTURED BY: (!G <br />C. DATE INSTALLED(MOIDAY/YEAR) / g�, <br />D. TANK CAPACITY W GALLONS: Y <br />II. TANK CONTENTS IFA -1 IS MARKED. COMPLETE ITEM C. <br />A 1 MOTOR VEHICLE FUEL <br />4 OIL <br />B. <br />C. <br />REGULAR <br />taUNLEADED <br />8 <br />3 DIESEL <br />❑ 6 AVIATIONGAS <br />❑ 2 PETROLEUM <br />❑ W EMPTY <br />I., PRODUCT <br />❑ <br />lb PREMIUM <br />B. TANK <br />4 GASAHOL <br />❑ ] METHANOL <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />MATERIAL <br />❑ 5 CONCRETE <br />UNLEADED <br />❑ <br />5 J <br />(Primary Tank) <br />❑I 3 CHEMICALPRODUCT <br />❑ 95 UNKNOWN <br />❑ 2 WASTE <br />❑ <br />2 LEADED <br />❑ <br />OT <br />W O <br />OTHER(DESCRIBE IN ITEM D. BELOW) <br />D. IF (A1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING6 <br />C. A S.9: <br />F795 UNKNOWN <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,S.AND C. AND ALL THAT APPLIES IN BOX D AND <br />A. TYPE OF <br />F7 1 DOUBLE WALL <br />7 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />EN 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT IVAULTED TANK) <br />❑ 99 OTHER <br />B. <br />ttli,BARE STEEL <br />F72 STAINLESS STEEL <br />F-]3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ ] ALUMINUM <br />❑ B 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />MONITORING <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LNING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING6 <br />UNLINED <br />F795 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH I0 METHANOL? <br />YES_ NO_ <br />D.CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />95 UNKNOWN <br />``------''�� <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />IV. PIPING INFORMATION CIRCLE A IFABOVEGROUNOOR U IFUNDERGROUNO. MOTH IF APPLICABLE <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />A <br />2 RESSURE A U <br />3 GRAVITY <br />A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A <br />SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />I BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A U <br />6 CONCRETE A U <br />10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE IPVC) A U <br />7 ST�W/COATING A U <br />p U UNKNOWN A U <br />4 FIBERGLASS PIPE <br />6 100% METHANOL COMPATIBLE W/FRP <br />99 OTHER <br />D. <br />LEAK DETECTION <br />❑ I <br />AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ I <br />MONITORING <br />E] 99 OTHER <br />V. TANK LEAK DETECTION <br />7-1 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />6 TANK TESTING a 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />i. ESTIMATED DATE LASTUSED,(ALO/DAY 2. SUBSTANCE REMAININGF %� GALLONS 3 WASTANK FILLED NERT MATERIALI7H YES ❑ NO <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />APPLICANT'S NAME DATE <br />(PRINTED A SIGNATUAEI <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />STATE I. Dl <br />COUNTY # <br />m%6 <br />JURISDICTION # <br />FACILITY # <br />TANK # <br />PERMIT NUMBER <br />PERMIT APPROVED BYIDATE <br />PERMIT EXPIRATION DATE <br />FORMS (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />0 <br />0 <br />F0R93MB-R5 <br />