Laserfiche WebLink
rSTATE OFCALIFORMA � �: <br />0 , <br />STATE WATER RESOURCES CONTROL BOARD i <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B <br />, �.. A <br />rer . <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM �"��°"��� <br />MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />1. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I.D.# z— <br />B. <br />R. MANUFACTURED BY: L 1... <br />C. DATE INSTALLED (MOIDAY/YEAR) <br />7 <br />D. TANK CAPACITY IN GALLONS: <br />ILTANKCONTENTS IFA -11S MARKED. COMPLETE ITEM C. <br />A MOTOR VEHICLE FUEL ❑ 4 OIL <br />B. <br />C. <:N /a UNLREGULAR EADED <br />3 DIESEL ❑ 6 AVIATION GAS <br />❑ 2 PETROLEUM ❑ 60 EMPTY <br />❑ 1PRODUCT <br />ib PREMIUM <br />UNLEADED <br />4 GASAHOL ❑ 7 METHANOL <br />❑ 5 JETFUEL <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />❑ 2 LEADED <br />❑ gg OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. s: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C. AND ALL THAT APPLIES IN BOX D AND <br />A. TYPE OF <br />❑ 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />❑ 99 OTHER <br />A(5? SINGLE WALL <br />1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEELCLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br />❑ B 100% METHANOL COMPATIBLE W/FRP <br />(PrimaryTank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />7 STEEL W/COATING <br />❑ 1 RUBBER LINED <br />2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING <br />�6 UNLINED <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />LEAK DETECTION <br />❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3IERTTIALMONORING <br />❑ 99 OTHER <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES— NO— <br />D. CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />771 3VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION ❑ 91 NONE <br />95 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. <br />SYSTEM TYPE <br />A U 1 SUCTION <br />A 40 PRESSURE A U <br />3 GRAVITY <br />A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A(5? SINGLE WALL <br />A U 2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />A U I BARE STEEL <br />A U 2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC)A U <br />4 FIBERGLASS PIPE <br />CORROSION <br />A U 5 ALUMINUM <br />A U a CONCRETE A U <br />7 STEEL W/COATING <br />A U <br />S 100% METHANOL COMPATIBLE W/FRP <br />PROTECTION <br />A U 9 GALVANIZED STEEL <br />A U 10 CATHODIC PROTECTION <br />A(f�A UNKNOWN <br />A U <br />99 OTHER <br />D. <br />LEAK DETECTION <br />❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3IERTTIALMONORING <br />❑ 99 OTHER <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />1. ESTIMATED DgTE <�1 USE (MO/OAYNFI) 2. ESTIMATED QUANTITY OF & WAS TANK FILLED WITH <br />i/ (''`/ SUB STANCE REMAINING GALLONS INERTMATERIALT YES ❑ NO ❑ <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />APPLICANTS NAME DATE <br />(PRINTED A SIGNATURE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK it p <br />STATE I.D.# <br />PERMITNUMBER PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATE („ <br />FORMS (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />FOROM&R5 <br />