Laserfiche WebLink
0 <br />STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT ❑ <br />5 CHANGE OF INFORMATION <br />❑ 7 PERMANENTLY CLOSED ONSITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT ❑ <br />6 TEMPORARY TANK CLOSURE <br />❑ 8 TANK REMOVED <br />B. TANK <br />❑ 7 BARE STEEL <br />❑ UNLEADED <br />G <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />K6; n Z --Gd / <br />s4!/� <br />❑ 99 OTHER (DESCRIBE IN REM D. BELOW) <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br />A OWNER'S TANK I. D. p -MANUFACTURED <br />K/ <br />C. DATE INSTALLED(MO/DAYNEAR) �� CI <br />D. TANK CAPACITY IN GALLONS: <br />11. TANK CONTENTS IFA -1 IS MARKED, COMPLETE ITEM C. <br />A MOTOR VEHICLE FUEL ❑ 4 OIL <br />B. <br />C. ❑ 1e REGULAR UNLEADED <br />❑ 3 DIESEL ❑ 6 AVIATIONGAS <br />❑ 2 PETROLEUM ❑ BO EMPTY <br />PRODUCT <br />uQ`\lfcb PREMIUM UNLEADED <br />❑ 4 GASAHOL ❑ 7 METHANOL <br />B. TANK <br />❑ 7 BARE STEEL <br />❑ UNLEADED <br />❑ 5 JET FUEL ❑ BM85 <br />❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />LEADEMIDGRAD <br />❑ 2 LEADED <br />❑ 99 OTHER (DESCRIBE IN REM D. BELOW) <br />D. IF (XI) IS NOT MARKED, ENTER NAME OFSUBSTANCE STORED C. A. S.#: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A, B, AND C. AND ALL THAT APPLIES IN BOX D AND E <br />A. TYPE OF <br />2�7 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br />SYSTEM <br />❑ 22 SINGLE WALL <br />❑ 4 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />B. TANK <br />❑ 7 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />4 STEEL CLAD Wl FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />95 UNKNOWN <br />❑ 99 OTHER <br />C. INTERIOR <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LININGAAA.❑..,,��,, <br />3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />LINING OR <br />F-15 GLASS LINING <br />❑ 6 UNLINED <br />�95 UNKNOWN <br />❑ 99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE <br />WITH 100% METHANOL? <br />YES— NO— <br />D, EXTERISIONOR <br />❑ 1 POLYETHYLENE WRAP <br />E]2 COATING <br />❑ 3 VINYL WRAP <br />FIBERGLASS REINFORCED PLASTIC <br />CORRO <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />❑95 UNKNOWN <br />99 OTHER <br />E SPILL AND OVERFILL, BLC. SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />DROP TUBE VES_ <br />NO_ STRIKER PLATE <br />YES NO <br />DISPENSER CONTAINMENT YES_ NO <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />A U <br />1 SUCTION <br />PRESSURE A U <br />3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A <br />DOUBLE WALL A U <br />3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A U <br />6 CONCRETE A U <br />10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />7 STEEL W/COATING A U B 100% METHA OL COMPATIBLE W/FRP <br />A U 95 UNKNOWN �99 OTHER_ <br />D. LEAK DETECTION <br />1 Aff01VNICAI uxE IFAK <br />❑ CETECfOP ❑ <br />2 TE TIGx9,9ss 3 comTUWS 6NTERSTIIIAL 4 ELEMOM0 UNE 5 Aff0WTK PUMP ❑ <br />TESTING NiORING ❑ 1FAK DETECTOR ❑ SHU m 99 OTHER <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK ❑ 2 MANUAL ECONCILATIONORV ❑ 3 VAOZEMONIITORING ❑ 4 AUTOMATGAUGING MONITORING <br />TANK ❑ 5 GROUND MONTORINGTER ❑ 6 ANNUALTESTING <br />CONMON INUOU INTERSTITIAL ❑ 8 SIR E]9 TANK WEEKLY <br />MANUAL ❑ 10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN-PLACE) <br />1. ESTIMATED DATE LAST USED (MO/DAYNR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO ❑ <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />ATE <br />(PRINTED a SIGNATURE) TANK OWNER'S NAME D <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # D <br />STATE I.D.# m 1- 1 <br />PERMIT NUMBER PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATE 1 / ?TOA <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLION • FORM A, UNLESS ACURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br />SHOULD BE ACCOMPANIED BY A PLOT P RLE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THIERGROUND STORAGE TANK REGULATIONS <br />FORM B (6 95) <br />