Laserfiche WebLink
STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br />ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED C.. 7 <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: o7-4-0- <br />- �l D <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br />A OWNER'S TANK I. D. # ? B. MANUFACTURED BY: <br />C. DATE INSTALLED(MO/DAYNEAR) / rj` 7 D. TANK CAPACITY IN GALLONS: <br />IL TANK CONTENTS IFA -1 IS MARKED, COMPLETE ITEM C. <br />p �1 MOTOR VEHICLE FUEL 040IL <br />B. <br />C, 1a REGULAR UNLEADED <br />❑ 3 DIESEL ❑ 8 AVIATION GAS <br />❑ 2 PETROLEUM ❑ 80 EMPTY <br />IIII�--------',,,,�ppppT <br />�1 PRODUCT <br />❑ 1b PREMIUM UNLEADED <br />❑ 4 GASAHOL ❑ 7 METHANOL <br />❑ 3 CHEMICALPRODUCT ❑ 85 UNKNOWN <br />❑ 2 WASTE <br />❑ 1c MIDGRADE UNLEADED <br />❑ 2 LEADED <br />❑ 5 JET FUEL ❑ 8 M85 <br />❑ 99 OTHER (DESCRIBE IN REM D. BELOM <br />D. IF(A.1) IS NOT MARKED, ENTER NAME OFSUBSTANCE STORED C.A.S.#: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A. B. AND C. AND ALL THAT APPLIES IN BOX n ANI) F <br />A. TYPE OF <br />1 DOUBLE WALL <br />[:]3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 5 INTERNAL BLADDER SYSTEM F-195 UNKNOWN <br />SYSTEM <br />�❑�qq <br />[a 2 SINGLE WALL <br />❑ 4 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />B. TANK <br />© 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE WIFRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />C. INTERIOR <br />❑ 1 RUBBER UNED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />LINING OR <br />❑ 5 GLASS LINING <br />F(5q 6 UNLINED <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE WITH 100°/. METHANOL7 <br />YES_ NO— <br />D. EXTERIOR <br />CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />F27195 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL, BIC. SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />DROPTUBE VES_ <br />NO_ STRIKERPLATE <br />YES NO_ <br />DISPENSER CONTAINMENT YES NO <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />A& 2 PRESSURE A U <br />3 GRAVITY <br />A U 4 FLEXIBLE PIPING A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A <br />1 SINGLE WALL <br />A U 2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />S ALUMINUM <br />9 GALVANIZED STEEL <br />A U 2 STAINLESS STEEL A U <br />A U 6 CONCRETE A U <br />A U 10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />7 STEEL W/ COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br />ALV95 UNKNOWN A U 99 OTHER <br />D. <br />LEAK DETECTION <br />❑ <br />1 MEcWV KAL UNE LEAK ❑ <br />GETECTOA <br />2 UNE TIGHTNESS ❑CM <br />3 CINUWS W MTmAL 4 ELEM MC LINE <br />TEGTWG MGMTIXVMO ❑ LEAN DETECTOR <br />5 AUTCM4TIC PUMP <br />vUTX)wN ❑ 99 OTHER <br />V, TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK L{G 2 RECONCILATIONINVENTORY ❑ 3 VADOZE MONITORING ❑ 4 GAUGWGAUTOMATIC TANK ❑ 5 GROUND MON TORINGWATER ❑ 6 ANNUALTANK <br />❑ 7 <br />MONITORING INTERSTTIAL PiL--JI 8 SIR ❑ 9 WEEKLY MANUAL ❑ 10 MONTHLY TANK ❑ 95 UNKNOWN E:]99 OTHER <br />TANK GAUGING TESTING <br />VI. IANK L:LUSUHE INFORMATION (PERMANENT CLOSURE IN-PLACE) <br />1, ESTIMATED DATE LAST USED (MO/DAYNR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ❑ NO ❑ <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE. IS TRUE AND CORRECT <br />TANK OWNER'S NAME DATE <br />(PRINTED A SIGNATURE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />STATE I.D:# <br />COUNTY # JURISDICTION # FACILITY # TANK # - <br />PERMIT NUMBER PERMIT APPROVED BVA)ATE PERMIT EXPIRATION DATE <br />I nl5 FUHM MUST BE ACCOMPANIED BY A PERMIT APPLICATION- FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS Fn - <br />SHOULD BE ACCOMPANIED BY A PLOT PULE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE wGROUND STORAGE TANK REGULATIONS <br />FORM B (6.95) - FOR00 <br />