Laserfiche WebLink
•• <br />Three complete Dans <br /># <br />sets (include manufacturer's specificatioAts for proposed equipment to <br />be installed). <br />2. <br />Plans drawn to scale in non -erasable print. <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />3. <br />Plot plan to show location of tanks and all associated piping. <br />00 <br />4. <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />1 <br />5. <br />Tank cross-sectional diagram. <br />6. <br />Detail of tank, associated piping, excavation and cover. <br />B. <br />7. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />(1) <br />8. <br />Verification of product compatibility with the tank(s), piping, monitoring <br />_ <br />(2) <br />device(s), epoxy or silicone glues, etc. <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />Hydrostatic annular (primary tank pressure test). <br />10. <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />y� <br />secondary (2') containment systems before covering. [Section 2635 (a) (3) & (4)] <br />Y <br />(1) <br />ED <br />11.x_ <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Field installed cathodic protection systems designed and certified as adequate by a <br />Chapter 6.7, Section 25291 (h)] <br />12. <br />TANK COMPOSITION <br />TANK # <br /># I <br /># <br /># 3 <br /># <br /># <br />CAPACITY <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />fZ dfl <br />000 <br />00 <br />MANUFACTURER <br />1 <br />Tested at the installation site using an electric resistance holiday detector. <br />(2) <br />COMPOSITION <br />B. <br />Fiberglass <br />tBODEL. <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ <br />(2) <br />PRODUCT, <br />(3) <br />Hydrostatic annular (primary tank pressure test). <br />C. <br />CORRO ROTECT iON <br />1R <br />07x <br />y� <br />ti <br />Y <br />(1) <br />ED <br />etc.). <br />COMPATIBILITY WITH 100% <br />METHANOL <br />(2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />13. TANK(s) TO BE <br />INSTALLED <br />A. <br />Steel -clad <br />with <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings <br />or coverings. <br />(1) <br />Tested at the installation site using an electric resistance holiday detector. <br />(2) <br />Vacuum applied to interstitial space. <br />B. <br />Fiberglass <br />_ <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ <br />(2) <br />Vacuum applied to interstitial space. <br />(3) <br />Hydrostatic annular (primary tank pressure test). <br />C. <br />Nan -clad <br />steel <br />tank [Section 2635 (a) (2) (A)] <br />(1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) <br />Impressed current systems to be inspected no Less than every 60 days. <br />5 <br />