Laserfiche WebLink
TANK 0 <br />9 <br />• • <br />OST <br />SYSTEM DRAWING INFORMATION <br />1. <br />CAPACITY <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />/X�Z <br />lm®COQ <br />Plans drawn to scale in non -erasable print. <br />3. <br />_6L <br />Plot plan to show location of tanks and all associated piping. <br />4. <br />__Z <br />striker plates or drop tube -mounted. bottom protectors illustrated below all accessible openings. <br />5. <br />_� <br />Tank cross-sectional diagram. <br />6. <br />1 <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />/ <br />Tank(s) and piping approved by a nationally recognized independent testing organization. CTitLe 23, Chapter 16, <br />Non -clad steel <br />tank (Section 2635 (a) (2) (AM <br />Article 3, Section 2631 (b) & 26351 <br />_ (1) <br />PRODUCT <br />UNI.. <br />8. <br />Verification of product compatibility with the tank(s), piping, monitoring <br />(2) <br />CORROSION PROTECTION <br />device(s), epoxy or silicone glues, etc. <br />9. <br />corrosion specialist. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />(3) <br />U.L. LISTED <br />10. <br />1 <br />At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br />COMPATIBILITY WITH 100%. <br />METHANOL <br />secondary (2m) containment systems before covering. (Section 2635 (a) (3) & (4)] <br />IT. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />12. <br />TANK COMPOSITION <br />TANK 0 <br />9 <br />a <br />fA. <br /># <br />d <br />CAPACITY <br />cE)X <br />E[.19 <br />/X�Z <br />lm®COQ <br />// b `0 <br />00 <br />(2) <br />MANUFACTURER <br />,yIZ <br />M <br />I U v,l <br />Fiberglass <br />J c, <br />(1) <br />COMPOSITION <br />(2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />MODEL <br />_ C. <br />Non -clad steel <br />tank (Section 2635 (a) (2) (AM <br />_ (1) <br />PRODUCT <br />UNI.. <br />GN L f <br />P t <br />D <br />(2) <br />CORROSION PROTECTION <br />corrosion specialist. <br />(3) <br />U.L. LISTED <br />COMPATIBILITY WITH 100%. <br />METHANOL <br />13. TANK(s) TO <br />BE INSTALLED <br />fA. <br />Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />✓ (1) <br />Tested at the installation site using an electric resistance holiday detector. <br />(2) <br />Vacuum applied to interstitial space. <br />B. <br />Fiberglass <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />(2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />_ C. <br />Non -clad steel <br />tank (Section 2635 (a) (2) (AM <br />_ (1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc-). <br />(2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) <br />Impressed current systems to be inspected no Less than every 60 days. <br />5 <br />