Laserfiche WebLink
19. Piping <br />(cross-sectional LTagram, <br />including connections to tank and dispensers). <br />- (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />Restricts delivery of flow to tank [Section 2635 (b) (2) (B) <br />or (C)], or <br />_ <br />Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], <br />or <br />l8) ✓ <br />Vapor recovery piping designed so it cannot contain Liquid phase product, or <br />(C) <br />Suction piping (below grade piping operates at Less than atmospheric pressure) [Section 2636 <br />(a) (3)] <br />SLoped socontents of the pipe wilt drain back into the storage tank if the <br />suction is <br />released. <br />_ No valves or pumps installed below grade. <br />inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) _AC <br />Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) t/ <br />Underground primary piping will meet alt of the following requirements <br />✓" Primary piping in contact with hazardous substance under normal operation conditions <br />shall be: <br />installed inside a secondary containment system in the form of: ✓'secondary pipe <br />or <br />_Vault <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />Primary piping and secondary containment systems will be installed in accordance with <br />industry <br />code of practice and voluntary consensus standards.. <br />_ Lined trench used as secondary containment <br />Material compatible with the substance stored. <br />_ Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />_jtf-� Secondary containment will be equipped with a continuous monitoring system connected <br />to an audible <br />and visual alarm system. <br />Automatic line tr a��k detectors will be installetj on pressurized piping <br />Manufacturer:_/t(eLy��Ca(�_� Model: <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Lf� Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. _� State Water Resources Control Board "Facility (A)" and '-Tank Permit (B)" application forms submitted. <br />21. !/ Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring welt data, water <br />studies, etc.) <br />23. _�/ Total nunber of tanks on site after installation: _/ <br />24. _L/ County/City Fire District and Building Department notified. <br />25. -fes <br />In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br />NameD�ul: 1 ()u.Of-1Q II Title Prose . CAn4�„v41V� Data 7-LS-y,Z <br />v <br />CONDITIONS OF APPROVAL: <br />U <br />