My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 11:42:14 AM
Creation date
11/5/2018 5:52:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\2500\PR0231356\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Pipe Routing <br />The type of pipe routing design selected is dependent on the quantity and <br />orientation of the dispensers, the type of system (either pressure or suction) <br />and the layout of the facility. One constant design requirement is that all <br />Piping runs between containment sumps be continuous. Single and dual <br />Piping lines may be used depending on the total quantity of dispensers to <br />be serviced and the location and orientation of the islands. The pipe routing <br />design criteria for GeoFlex Piping System is considerably different than that <br />of conventional rigid piping.. -For either new or retrofit Installations good pre- <br />installation planning is a must to Insure a proper and hydraulically efficient <br />installation. <br />Design Criteria <br />When designing and installing GeoFtex Piping Systems use the following design criteria to insure that the piping system meets Environ's requirements: <br />1 FI <br />exible piping turns should not be less than an 24" (450mm) bend <br />radius. Piping trenches should be cut with sweeping turns. <br />2. For flexible piping systems which have piping crossovers, install the <br />Crossover Supports at each Intersection. <br />3. All flexible piping runs should be continuous, each beginning and ending <br />within a containment sump. <br />4. It is not necessary to have continuous fall back to the lank for pressure <br />type piping systems which are routed in series if the Liquid Interstitial <br />Monitoring System is installed. <br />S. For a pressure piping system using single piping runs routed In series, no <br />more than a total of six dispensing nozzles should be serviced with a <br />1-1/2" single piping line to prevent unacceptable product flow rates. <br />6. If GeoFtex Piping is used for vent lines, make sure there is adequate fall <br />back to the lank from the vent stack. <br />7. The dispensing product sequence will alternate from one dispenser to the <br />next when "loop-arounds" are used. Pipe Crossovers are recommended <br />at these points to correct the change in product sequence in -series' <br />routing of pressure piping systems. <br />Series Routing <br />For "Pressure Piping Systems' the most effective routing design for flexible pipind Is 'series routing', which means directly interconnecting the underground <br />storage lank to the dispensers by running from one dispenser to the next, without Interruption. The example layout below shows two methods of "aeries routing'. <br />Single Piping Lines <br />Dual Piping Lines <br />A, , <br />f®31� III <br />�o <br />
The URL can be used to link to this page
Your browser does not support the video tag.