Laserfiche WebLink
4' a• Describe the method that will be utilized to <br /> Purge and/or inert the tank(s): <br /> b. Tank/Piping Hauler: <br /> Name <br /> Address <br /> Phone No.(—) City <br /> �--� Zip <br /> Hauler Registratioo # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name <br /> Address <br /> City — Zip <br /> Phone No-t ) —� <br /> FPA ID# (if transported to a permitted TSD facility) <br /> 9• Describe, in detail, how the soil and/or 'voter sample(s) beneath the tank and piping will be obtained: <br /> o O�w.� <br /> rr <br /> 111• Descrihe how the excavation will be backfilled with suitable material upon removal: <br /> If. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> b) What will be the final destination of the excavated stockpile? <br /> LQ J <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> Name <br /> Hauler Registration # <br /> Address ------- <br /> Phone No. ( _ <br /> City Zip <br /> ) —� <br /> Ell 23 046 (Revised 9/1li96) <br /> Page 5 <br />