My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOMA
>
301
>
2300 - Underground Storage Tank Program
>
PR0506701
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 11:55:06 AM
Creation date
11/5/2018 5:56:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0506701
PE
2381
FACILITY_ID
FA0007588
FACILITY_NAME
ELIZABETH EMERY TRUST
STREET_NUMBER
301
STREET_NAME
LOMA
STREET_TYPE
DR
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
301 LOMA DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOMA\301\PR0506701\BILLING 1997 - 1998.PDF
QuestysFileName
BILLING 1997 - 1998
QuestysRecordDate
7/26/2017 4:14:24 PM
QuestysRecordID
3529421
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • STATE OF CALIFORNIA ,<so���ee <br /> STATE WATER RESOURCES CONTROL BOARD ~o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B o a <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> 0 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Jp/ L� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# � B. MANUFACTURED BY: u <br /> C. DATE INSTALLED(MODAYNEAR) K D. TANK CAPACITY IN GALLON,%y(j4- <br /> II.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL B, C ❑ 1a REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ SO EMPTY ❑ 1 PRODUCT ❑ 1b PREMIUM UNLEADED ❑ 4 GASAHOL ED] 7 METHANOL <br /> ❑ 1G MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER IDESCRIBEINTEMO.BELOW) <br /> 0. IF(A.1)ISNOTMARKED, ENTER NAME OFSUBSTANCE STORED 'r-466111, I <br /> C.A.B.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL O 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100•.6 METHANOL? YES_ NO— <br /> D.EXTERIOR <br /> CORROSION El1 POLYETHYLENE WRAP 2 COATING <br /> ❑ ❑ 3 VINYL WRAP ❑ d FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,BTC. SPILL CONTAINMENT INSTALLED(YEAH) OV RFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES_ NO_ <br /> IV. PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH Ad::3% UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 MECWWIGLL UNE LEAK 2 UNE IIGMNESS O 3 OWINUMS Im ASTM ELELmQVIC LINE 5 AxfOMAnC PUMP <br /> OETEmOq TESTING MGMTM?IIG ❑4 lMN DETECTOR ❑ SH9TWWN 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RECONCILANUAL IIATIONORY ❑ 3 MONIITORING OZE ❑ 4 AUTOMATGAUGNGIC TANK ❑ 5 MONTORINGWATER ❑ 6 TESTING <br /> 7 <br /> MONITORING INTERSTITIAL ❑ B SIR ❑ 9 WEEKLY MANUAL ❑ 10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> TANK GAUGING TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE T S (MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO SUBSTANCE REMAINING_GALLONS INERT MATERIAL 7 ❑ <br /> THIS FORM HAS 9EEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND C RECT <br /> TANK OWNER'S NAME DATE <br /> (PRIMED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION If FACILITY# TANK# DD <br /> STATE I.DN p b 0 1 0 0 <br /> PEfl...NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLIC ON-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FO C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THEORGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.