Laserfiche WebLink
% r 6 <br /> BOARD OF TRUSTEES SAN JOAOUIN LOCAL HEALTH DISTRICT SERVING <br /> Af Crow,Pros, San Jougwn County <br /> Earl Pimemel,vacs Pres. 1601 East Hazelton Avenue City of Manteca <br /> Tommy Joyce,Sacy. Stockton, California 95205 City of Escalon <br /> James F.Culbenson City of Lodi <br /> John D.Mast,M.D. JOGI KHANNA, M.D., M.P.H., DISTRICT HEALTH OFFICER Cay of Tracy i. <br /> Thoma Mathews <br /> 209/4GS-3420 City of Ripun <br /> Thomas Schuboq D.V.M. <br /> Daphne Shaw San Joaquin County HanCity ul Stocktonay Williams,Ph.D. San Joaquin Cuumy <br /> Facility Name mex(-kctc4o Bnofkfi-5 <br /> Address f 2E7cr0 E Laurso P- <br /> I <br /> Date of Inspection Inspector <br /> MODIFIED MONITORING ALTERNATIVE #7 <br /> Farm Tanks 1100-5000. Gallons` Only I <br /> Limited to underground storage tanks which have infrequent inputs <br /> and withdrawals and where the liquid level in the tank can be <br /> measured to an accuracy of +5 gallons or less when the tank is <br /> half full. <br /> This monitoring alternative shall include: <br /> Initial precision test on tank and piping, every 3 years <br /> thereafter. <br /> Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent <br /> unauthorized inputs and withdrawals. <br /> Tank must have no inputs or withdrawals for at least <br /> a 48 hour period (2 days) on a monthly basis. <br /> (For example: tank in use Monday through Friday, <br /> then locked over weekend) . <br /> (/ Liquid level measurements are taken at the beginning <br /> and end of the monitoring period ( lasting at least 48 <br /> hours) . <br /> (For example: level measured and recorded <br /> Friday night before locking and <br /> again on Monday morning before <br /> / opening. ) <br /> Y If liquid level varies more than 1% of the tank volume <br /> or 5 gallons, which ever is less, between <br /> measurements, an unauthorized release shall be assumed <br /> to have occurred and shall be reported to the local <br /> agency within 24 hours, as per Article 5, Sect. <br /> 2652 of the regulations and further evaluations <br /> shall be performed to verify or disprove the <br /> variations. i <br /> Implementation of the monitoring alternative requires that the j <br /> following circled items be completed by the dates specified. <br /> 1. Precision test(s) must be performed by and <br /> results submitted to this office within 30 ays of the test. <br /> 2 . Monthly tank gauging must be started immediately. (See <br /> instructions above) . <br /> If the above compliance dates cannot be met, contact this office <br /> prior to the specified date. <br />