Laserfiche WebLink
12. Handling of excavated soil: <br /> a) What material will be used to line and cover the tank & piping stockpile placed on the ground? <br /> A.O <br /> b) What will be the dlsposlt on of the tank pipings ck lie after analysls7 <br /> jr� <br /> t. <br /> 13. What Is the depth to groundwater? / <br /> Describe the source of Information: <br /> 14. Are there any wells on this parcel or adjacent properties? 0!1.1 YC-8 O <br /> TYPE OF WEI.I S DISTANCE T2 TANKS(S) <br /> Public Well ft. <br /> Private Well A. <br /> Irrigation Well ft. <br /> Monitoring Well ft. <br /> Other ft. <br /> is. Will the tank(s) pending closure be replaced with an aboveground or underground storage lank(s) and has it e <br /> responsible party submitted a "Letter or Commitment" to PHS/EHD? <br /> v -�1 <br /> Page 6 <br /> closplan (Rev 4/22/91) v+p <br />