My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1631
>
2300 - Underground Storage Tank Program
>
PR0501135
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 4:49:12 PM
Creation date
11/5/2018 6:18:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0501135
PE
2381
FACILITY_ID
FA0004999
FACILITY_NAME
ROBINSON TRANSPORTATION
STREET_NUMBER
1631
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19810004
CURRENT_STATUS
02
SITE_LOCATION
1631 LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\1631\PR0501135\REMOVAL 1993.PDF
QuestysFileName
REMOVAL 1993
QuestysRecordDate
7/27/2017 5:31:40 PM
QuestysRecordID
3533505
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 18 __Tvliiw� <br /> DEV E HAENT SE AVE., STONE-- N.(2 91 68.31 DEVELOPMENT SERVICES PHONE 1209) 1663120PLANNING PHONE (2091468-3120 <br /> BUILDING PHONE:120911684123 0 81993 FEB <br /> NEIGHBORHOOD PRESERVATION PHONE 12091 4664021 F E D 8 19 3 <br /> ENVppIR���O�MMN�TM/IENTAL HEALTH <br /> BACKFILL EXCAVATION CEIETIFIMeES WOU1411I UtVLLUhvib1i OLH. <br /> PLANNING DIVISION <br /> Project Location 1651 Louise Ave. Lathro Ca. 95330 <br /> Owner Commercial Transfer Inc. Phone No. (209)983-0233 <br /> Contractor Jim Thorpe Oil Inc. Phone No. (209)368-6175 License No.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> X 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 12" lifts: <br /> A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> Inch in diameter. <br /> B. Crushed rock - self-compacting material not more than three-quarters <br /> — (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> * Richard Thorpe <br /> Name (Print) <br /> President Jim Thorpe Oilll e. <br /> Tit. (Prin <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.