Laserfiche WebLink
I <br /> i' <br /> FIBERGLASS POLYGON TURBINE ENCLOSURE <br /> TANK PROBE U <br /> ERGLASS POLYGON TURBINE ENCLOSURE Z <br /> -- - TANK PROBE a <br /> -- - TANK MANHOLE COVER (22" DIA,) TANK MANHOLE COVER <br /> W I <br /> U N <br /> FUEL OIL RETURN & VENT FUEL OIL SUPPLY TANK VENT 94 o <br /> 4'-0LD' �\ O O FUEL OIL RETURN W <br /> 4'-3" O.D. <br /> 000 00 a <br /> .x w � <br /> � <br /> FUEL OIL SUPPLY 0 � <br /> TANK FILL • anti <br /> 17OTSPILL CONTAINMENT mANK d <br /> INTERSTITIAL ACCESS MANHOLE E <br /> oro° <br /> - 1 ' 1/8" '- 1 !1 /8" TOP VIEW � <br /> TANK INTERSTITIAL ACCESS �'' ° <br /> 3 1/2 � <br /> (EXISTING) N9SE' o 0� <br /> - 3 -3 1 E„ FOR EXACT LOCATIONS TOP VIEW o c: <br /> " OF TANK DEVICES REFERENCE <br /> 6'-7 -' _ TOP VIEW (NEW CONSTRUCTION) (NEW CONSTRUCTION) <br /> i <br /> I <br /> CAP & ADAPTER FOR <br /> �`--' TANK LEVEL PROBE <br /> Z <br /> - FIELD FIT TURBINE �- <br /> (EBW #90037 SHOWN BEHIND) O <br /> HEIGHT J <br /> SPILL CONTAINMENTJ <br /> MANHOLE SEE DETAIL� C) <br /> Section View NEW FIBERGLASS PIPING SUMP p <br /> FINISHED GRADE <br /> (POLYGON TURBINE ENCLOSURE) <br /> � <br /> PREFORMED PLASTIC COVER r TOPROCK LLJ O <br /> WITH ALTERNATE YELLOW AND . DOUBLE ENTRY BOOT <br /> 4'7' BLACK BANDS ENVIRON DEB-7450 < f•- <br /> PREFORMED <br /> PLASTIC COVER WITH CD Q <br /> Q Q ALTERNATE YELLOW AND PLACK BQ <br /> ANDS Z U z � C) <br /> 3/4" FOS/1" FOR �Z Q Q <br /> SLOPE FOR DRAINAGE INSIDE 4,0" CONTAINMENT FIELD FIT 4" RISER O O <br /> (SEE NOTE 5) SCH 40 STEEL W <br /> 4,0�, PIPING $@AP 4'-0" <br /> GALVANIZED 4" PIPCRE__ _ SPLIT REDUCER DONUT CAP AND ADAPTER FOR nW < Ld L,_J Q <br /> FILLED WITH CONCRETE TANK INTERSTITIAL SENSOR <br /> ENVIRON SRD-1075 L_J Ln <br /> YELLOW _ EBW #90073 Y � In <br /> FASTEN COVER TO PIPE PRIMARY END FITTINGS ; <br /> PER MANUFACTURER'S INSTRUCTION - ENVIRON SPC-0075 (FOS) 4" x 18" RISER W _ <br /> I <br /> ENVIRON SPC-0100 (FOR) CN <br /> 2500 PSI CONCRETE <br /> Plan View <br /> FINISHED GRADE <br /> a <br /> VENT FLOAT VALVE ASSEMBLY BLEED HOLE (1/4") 0— <br /> " _ WITHIN 6" FROM THE TOP � <br /> (EBW #306-207-01, NOT SHOWN OF UST <br /> 1 �d I I III-I ,_ I I=1 =I - - FOR CLARITY) SEE DETAIL S DROP TUBE AUTO FILL LIMITER <br /> 550 Gallon Double Wall FRP Tank ill-lll_Ilf —III III=I_TI z <br /> FOS RISER 1-1/2" DROP TUBE Q <br /> 3 S c al (l e : 1 /2 " = 1 ' — 0 " 4'_0° SCH 40 STEEL <br /> -1 III FOR RISER 2" 0 <br /> • I= : SCH 40 STEEL z <br /> FOUNDATION - TANK z <br /> INTERIOR <br /> 1-1/2" FOOT VALVE <br /> EBW 151-200-01 <br /> Y <br /> 6" >a <br /> SPACE 5-0" ON CENTER AND 3'-0 FROM .TANK g <br /> L ` l Piping Sump Detail (New Construction) 0 <br /> 3 Bollard Detail o <br /> warERncer up 3 SCALE: No Scale 3 SCALE. NO SCALE N <br /> ENCLOSURE TOP—� <br /> s <br /> w <br /> I. Supply and install a new Containment Solutions fiberglass turbine lid <br /> JOINTFACTORY BONDED and reducer on the UST. The part numbers for these 98CO0250 and <br /> JOINT 90000247 respectively. The reducer is to be fastened to the turbine t I <br /> oPnoNai EXTENSION <br /> TURBJ30" ID i' enclosure With stainless steel bolts, washers and wing nuts, McMaster <br /> Boot BONDED N 32" OD 2' Corr part number 92198A542 or equivalent, three each spaced equally < <br /> FIELD BONDED (L) Q <br /> around the turbine. The lid is to be fastened with stainless steel <br /> JOINT pushpins;.. McMaster Carr part number 992384AO34, 1/4" diameter, 1" <br /> POLYGON <br /> TURBINE BODY <br /> 12 (w) Usoablee lenegtlh. These should Oslo be placed three each equally spaced <br /> FLAT PANELS 2, <br /> FIELD BONDED <br /> JOINT — raNK wau - 2. After the .reducer portion of the lid is installed, the lower joint to the <br /> coNralNUENr coLUR-� <br /> 5 turbine shall be sealed professionaffy Wffh GE Clear Silicon, on the interior 3'-s"D and exterior. This shall be done after the turbine unit has been <br /> �--- I installed and painted. <br /> 3. All exposed black pipe and fittings and the manway lid in the UST turbine <br /> shall be coated with Hempel, Hempodur 15400. This coating is to be <br /> applied per specifications and in a professional manner. The <br /> 2 Watertight Polygon Turbine Enclosure ( PTE) 42 " <br /> ( galvanized and brass fittings will not be painted. UPGRADE <br /> ) <br /> = 4. Additional sealant required ant eh below grade Environ turbine entry <br /> DETAILS <br /> S C a I e : 1 `2 " 1 ' — Q " boots and other related sealed joints shall be 3M 560-Scotch Seal <br /> Polyurethane Sealant or Bostick 1100 Fast Set Urethane Sealant, DATE: <br /> DESIGNED BY: 10/14/05 <br /> 5. Note that all piping and Conduit entering into the turbines mustbe ata JBS <br /> right angle to the turbine surface, without exception. DRAFTED BY: CLD <br /> 6. All pipe risers to be black steel. SCALE: <br /> AS NOTED <br /> JOB #: <br /> 7. The exterior exposed portion of the turbine and lids shall be sanded to a3101-33M <br /> semi-smooth surface and painted with three (3) coats of FILE NAME: <br /> Professional Spray Enamel ustoleum <br /> & Primary, Glossv White P /nlRu�Foo 3101-33M.DWG <br /> SHEET: <br />