My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2901
>
2300 - Underground Storage Tank Program
>
PR0231958
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 4:57:25 PM
Creation date
11/5/2018 6:20:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231958
PE
2381
FACILITY_ID
FA0003845
FACILITY_NAME
MUSD-DISTRICT OFFICE
STREET_NUMBER
2901
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19811004
CURRENT_STATUS
02
SITE_LOCATION
2901 E LOUISE AVE
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\2901\PR0231958\BILLING 1986 - 2000.PDF
QuestysFileName
BILLING 1986 - 2000
QuestysRecordDate
7/27/2017 6:19:26 PM
QuestysRecordID
3533942
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yOUN 0'w STATE OFCALIFORNIAp STATE WATER RESOURCES CONTROL BOARDrUNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> `-A YP .COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. �"'�� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION 7 PERMANENTLY CL E <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSUREB TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ZR 0( td A l X Vf Mal ((4' <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# 14 B. MANUFACTURED BY: u <br /> C. DATE INSTALLED(MO/DAY/YEAR) N 1 D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. Xj 1 MOTOR VEHICLE FUEL ❑ 4 OIL I 1.REGULAR <br /> C' ❑ UNLEADED ® 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY ❑ 1 PRODUCT ❑ 1bPREM IUM UNLEAD D ❑ 5 ET FUELAHO <br /> ❑ 7 MET ANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ gg OTHER (DESCRIBE IN ITEM . BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br /> C.A.S.# <br /> III. TANK CONSTRUCTION MARKONE ITEM ONLY IN BOXESA,B,ANDC,ANDALLTHATAPPLIES IN BOXDANDE <br /> A. TYPE OF m❑ 1 DOUBLE WALL E] 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM W 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK C� 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ q STEEL CLAD W/FIBERGLASS REINFOHCEI I PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING til 6 ❑ <br /> LINING �' UNLINED <br /> ❑ 95 UNKNOWN 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ i POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHE <br /> C. MATERIAL AND A 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 6 100% METHANOL COMPATIBL W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION [:7] 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3 <br /> ❑ MONITORING ❑99 OTHER ODUP <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MO ITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMAED DATE LAST USED(MO/DAY/9R) 2.ESTIMATED QUANTITYOF 7 3.WAS TANK FILLED WITH <br /> UK SUBSTANCE RLYAINING GALLONS INERTMATERIAL? YES ❑ N <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY O PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND COR ECT <br /> APPLICANTS NAME � /� <br /> (PRIN!SIGNATURE) A� la( Lb I� • DATE �/� /G 7 <br /> KK 1/] / <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER I OMPOSEDOFTHE FOUR NUMBERS BELOW <br /> STATE I.D.# <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> m � I�T� mTi�r� <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE LL� PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> • CJ', F01100 13 R5 <br /> �D_ I <br />
The URL can be used to link to this page
Your browser does not support the video tag.