Laserfiche WebLink
SAN JOAQ COUNTY ENVIRONMENTAL HEALTH -!ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑. 1.NEW PLAN N 2.CHANGE OF INFORMATION Mol- <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION' <br /> FACILITY ID k CIgenry Use Only) _ <br /> FACILITY NAME <br /> 1 M03, <br /> L <br /> FACILITY SITE ADDRESS 'n - Jc W. LO�Ue_l 1 J MooCITYi f c,c Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in nme <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED NJ I.ANNUALLY <br /> ❑ 99.OTHER(Specify): \102 <br /> IIL MONITORING LOCATIONS <br /> I"his monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monrtonng is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> fon,,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. 'TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULTS) <br /> SECONDARY CONTAINMENT IS: IR a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM ml 1. <br /> PANEL MANUFACTURER: ROT a.r M12. MODEL#: k7ff-�476 5 MT. <br /> LEAK SENSOR MANUFACTURER: 0 a non M14. MODEL#(S): L S-S MIs. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> A_NK( ) <br /> PANEL MANUFACTURER: Mn`. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: MI5. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑. b.DAILY/NIGHTLY ❑ c.WEEKLY Mea. <br /> ❑ d.MONTHLY ❑ e..OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1.g.p.h. ❑ b.0.2 g.p.h. ❑. c.OTHER(Specify): M22. Mn. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a_MANUAL PER 23 CCR§2646 ❑ It.STATISTICAL PER 23 CCR§2646.1 Mea <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27 <br /> ❑ 6.VISUALMONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(R W.a.gm�r npp.ovd) <br /> ❑ 99.OTHER(Specify)..: nue. <br /> V. PIPE MONITORING'. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) wo. <br /> jo I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(Sy7'RENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 10 &DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mat. <br /> PANEL MANUFACTURER: flanan M3' MODEL#: <br /> LEAK SENSOR MANUFACTURER: n a r M34. MODEL#(S): L S-3 nrrs. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? a.YES ❑ b.NO M36 <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC.PUMP SHUTDOWN? ® a YES ❑ b.NO na3. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s):_R 0 CL, n C Iw_pe k Ms'' MODEL#(S): _ I-X- I L/ M39.El3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40' MODEL#: M41 <br /> PROGRAMMEDLINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑. b.MINIMUM ANNUAL 0.1 g.p.h. W2. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO M43. <br /> WILL ELLD FAILUREMISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Moa <br /> af 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY �,b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mos. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY" ❑ c.Mw.MONTHLY&EACH TIME SYSTEM OPERATED'• M43. <br /> •R,,w.e8 app g ••Alkvmdfarnw rigofmburiedemergmeygmerntoraip*sonlypcl §23281.5(6x3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mee. <br /> SJCEHD-d(07/03)-1/4 0723/03 <br />